Talk of The Villages Florida

Talk of The Villages Florida (https://www.talkofthevillages.com/forums/)
-   The Villages, Florida, General Discussion (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/)
-   -   Morse Blvd bridge (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/morse-blvd-bridge-347211/)

photo1902 01-28-2024 03:25 PM

Quote:

Originally Posted by coffeebean (Post 2295974)
I drive in the diamond lane all the time along Odell Circle. For some reason, that does not seem nearly as dangerous as the diamond lane north of 466.

Ok. So?

oldyeller 01-28-2024 04:41 PM

Quote:

Originally Posted by photo1902 (Post 2295871)
Drive by tomorrow or Tuesday and take a look. Problem solved.

Not a problem, I was just asking if someone knew.

photo1902 01-28-2024 05:56 PM

Quote:

Originally Posted by oldyeller (Post 2295989)
Not a problem, I was just asking if someone knew.

I’ll be by that way this week and will take a look

Windguy 01-29-2024 06:35 AM

Quote:

Originally Posted by DonH57 (Post 2295820)
Even if it was open to cart traffic I wouldn't go on it. With the removal of the curbing separating cart and car traffic you just know between speeding cars and impatient cart drivers some one will do something stupid. I'll go way of BV MMP.

Wouldn’t they remove it only for a short way at Sunset Park?

Pgcacace 01-29-2024 07:32 AM

Diamond lane
 
Quote:

Originally Posted by coffeebean (Post 2295974)
I drive in the diamond lane all the time along Odell Circle. For some reason, that does not seem nearly as dangerous as the diamond lane north of 466.

Where is a diamond lane? Did you mean the cart lane?

Bill14564 01-29-2024 07:47 AM

Quote:

Originally Posted by Pgcacace (Post 2296089)
Where is a diamond lane? Did you mean the cart lane?

Yes, within the Villages the term "diamond lane" refers to the cart lane at the edge of roads such as Pinellas, Hillsborough, and Morse north of 466.

JGibson 01-29-2024 08:23 AM

They picked the busiest time of the year to perform this work.

Rodneysblue 01-29-2024 08:40 AM

Quote:

Originally Posted by photo1902 (Post 2295808)
Parker Morse Island Bridge project to begin

District Property Management will be performing revetment for the island's shoreline below Parker Morse Bridge to prevent erosion. This will involve clearing the area and installing rip-rap around the shoreline. The main area of construction will be stationed at the Sunset Park lookout at the center of the bridge. The park will be closed for the duration of the project. Curbing will be removed between the golf cart lane and automotive lane to allow entry and exit for equipment and construction materials. Construction flagmen will direct traffic when construction vehicles are commuting the bridge. Construction is scheduled to begin on Monday, January 29 and work hours will be 7 AM to 7 PM. We appreciate your patience as we strive to provide the best service possible and ensure the District's assets are preserved for our community. Thank you in advance for your understanding. If you have any questions, please call District Property Management at 352-753-4022.

Thank you for the information!

Keninches 01-29-2024 09:23 AM

They always do work at the busiest time of the year.

coffeebean 01-29-2024 11:12 AM

Quote:

Originally Posted by photo1902 (Post 2295976)
Ok. So?

So.......I don't drive in the diamond lane on Morse Blvd north of 466. That was my point. I'm sorry if I wasn't clear.

DonH57 01-29-2024 11:33 AM

Quote:

Originally Posted by Windguy (Post 2296072)
Wouldn’t they remove it only for a short way at Sunset Park?

I would think only for a short distance but some one will find a way to be to mess it up.

justjim 01-29-2024 12:55 PM

Quote:

Originally Posted by coffeebean (Post 2295974)
I drive in the diamond lane all the time along Odell Circle. For some reason, that does not seem nearly as dangerous as the diamond lane north of 466.

It might have something to do with the amount of traffic on Odell Circle vs Morse north of 466.

tophcfa 01-30-2024 03:25 PM

Quote:

Originally Posted by photo1902 (Post 2295808)
Parker Morse Island Bridge project to begin

District Property Management will be performing revetment for the island's shoreline below Parker Morse Bridge to prevent erosion. This will involve clearing the area and installing rip-rap around the shoreline. The main area of construction will be stationed at the Sunset Park lookout at the center of the bridge. The park will be closed for the duration of the project. Curbing will be removed between the golf cart lane and automotive lane to allow entry and exit for equipment and construction materials. Construction flagmen will direct traffic when construction vehicles are commuting the bridge. Construction is scheduled to begin on Monday, January 29 and work hours will be 7 AM to 7 PM. We appreciate your patience as we strive to provide the best service possible and ensure the District's assets are preserved for our community. Thank you in advance for your understanding. If you have any questions, please call District Property Management at 352-753-4022.

So much for the announcement construction will begin January 29th. Late afternoon on the 30th and nothing has begun?


All times are GMT -5. The time now is 08:21 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.