juddfl 08-19-2025 11:40 AM

My neighbor wanted just her kitchen popcorn removed as that was a low ceiling. They were told that the set up takes a lot of time and they only do the whole house, including the gargage. They had to stay at a hotel because of the mess. She said it was almost like moving with all the packing they had to do. She said it was expensive, but she liked it much better than popcorn ceiling. To her it was worth it.

Aces4 08-19-2025 07:36 PM

Quote:

Originally Posted by Babbs1957 (Post 2454622)
There are a number of options depending on what you want in the end.
-Scrape it and sand it smooth
-Scrape it and texture it
-Don't scrape and cover with thin drywall
-Don't scrape and cover with decorative ceiling tiles
-Don't scrape and cover with planked wood

We moved furniture to one side of the room, then work the open space. Then move it all back to the area we just finished and worked that side. Only one room was affected at a time and only during 9-4. Kids would come home from school and everything was clean and normal. I guess you could turn anything into a giant waste of money and scream horrors by removing all the furniture from the home, water abatement, ac system cleaning.....blah blah blah. I can make the baking of a cake sound like a multi-day process.

The difference is.......we have actually done it......several times.

Are you in your seventies or eighties, just curious..

kkingston57 08-19-2025 07:46 PM

Quote:

Originally Posted by defrey12 (Post 2454580)
This is not a viable option. MUCH more expensive. Everything must sill be removed from ALL rooms. Sheet rock dust permeates EVERYTHING, including the A/C system. It doesn't matter how much plastic one uses to block it. At least the popcorn removal process is "wet" hence no dust.

Failed to mention that the blown in ceiling insulation will come down also and need to be replaced

kkingston57 08-19-2025 07:48 PM

Quote:

Originally Posted by wslovely (Post 2454609)
Ditto to last. AB Drywall, two days, four crew, $3100 for 1500 sq ft.
No mess, satisfaction guaranteed.

Beats the heck out of some other $$$ quotes in this string

Laker14 08-19-2025 08:25 PM

Thank you to all for your responses. Much appreciated.


All times are GMT -5. The time now is 08:38 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.