Talk of The Villages Florida

Talk of The Villages Florida (https://www.talkofthevillages.com/forums/)
-   The Villages, Florida, General Discussion (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/)
-   -   Road Construction (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/road-construction-301801/)

anothersteve 01-17-2020 10:52 PM

Quote:

Originally Posted by villagetinker (Post 1710472)
Note: most of this work is done at night with minimal interference to the daytime traffic, Also, if I understand the sequence of the projects, BV will be starting in the North section while the Canal street work is being done, so NO interference, by the time they get to the section of BV between 466 and 466a Canal should be done and will be a suitable detour route.

According to the DS, both projects will take place between 7 A.M. and 5 P.M.
Steve

billethkid 01-18-2020 07:34 AM

Please let folks entering onto BV in!!!

The friendliness of TV residents will be put to the test.

mulligan 01-18-2020 08:27 AM

Quote:

Originally Posted by Gene Babb (Post 1710357)
Rainy season does make sense... How about doing one road with multiple crews (quicker) than the other to provide a good alternate for Major North --South travel

That won't happen for at least one reason : First responder access.

DeanFL 01-18-2020 08:49 AM

Quote:

Originally Posted by Gene Babb (Post 1710357)
Rainy season does make sense... How about doing one road with multiple crews (quicker) than the other to provide a good alternate for Major North --South travel

yes --- just as 'they' are doing I-4 in Orlando. OMG We avoid that fiasco at any cost...


All times are GMT -5. The time now is 11:20 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.