Whatever happened to the B.V. (and Morse) resurfacing?

Closed Thread
Thread Tools
  #31  
Old 02-20-2020, 05:32 PM
asianthree's Avatar
asianthree asianthree is offline
Sage
Join Date: May 2011
Location: Mallory, Pennacamp, Fernandinia, Duval, Richmond
Posts: 9,086
Thanks: 22
Thanked 3,578 Times in 1,323 Posts
Default

Quote:
Originally Posted by charmed59 View Post
Ask and ye shall receive. They are paving the left lane on Northbound Buena Vista today between St Charles and the Lake Miona Rec Center.
Traffic down to one lane moving smoothly. Must have started in the night, left lane was ready to be paved before 11am
__________________
Do not worry about things you can not change
  #32  
Old 02-21-2020, 07:16 AM
Dr Winston O Boogie jr's Avatar
Dr Winston O Boogie jr Dr Winston O Boogie jr is offline
Sage
Join Date: May 2012
Posts: 7,938
Thanks: 1
Thanked 2,154 Times in 770 Posts
Default

Quote:
Originally Posted by Bohare4 View Post
I was looking for those potholes too, and I couldn't find them either.
I was thinking the same thing. I drive Morse and Buena Vista all the time and never noticed any kind of bad conditions.
__________________
The Beatlemaniacs of The Villages meet every Friday 10:00am at the O'Dell Recreation Center.

"I never considered a difference of opinion in politics, in religion, in philosophy, as cause for withdrawing from a friend." - Thomas Jefferson to William Hamilton, April 22, 1800.
Closed Thread

Tags
sign, electronic, beginning, roadwork, morse

Thread Tools

You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 02:38 AM.