Talk of The Villages Florida

Talk of The Villages Florida (https://www.talkofthevillages.com/forums/)
-   The Villages, Florida, New Members Forum (https://www.talkofthevillages.com/forums/villages-florida-new-members-forum-115/)
-   -   anyone know the time involved in construction of new Designer Lily Home? (https://www.talkofthevillages.com/forums/villages-florida-new-members-forum-115/anyone-know-time-involved-construction-new-designer-lily-home-77473/)

davecz1 05-14-2013 10:18 AM

55 to 60 is norm.

PattyPan1 05-14-2013 05:55 PM

Two years ago we were told our Lily would take 90 days. It was finished in just over 60 days. If we had wanted to move in early we had to pay additional money. As we were in a rental, we decided to wait it out.


Quote:

Originally Posted by 123Cookie (Post 674686)
was given a window of 90 to 120 days -- can this be narrowed down any more-
any help appreciated..
br
Cookie


applesoffh 05-14-2013 06:06 PM

Boy oh boy, so much for the endless rumors that 1) everything being sold now is pre-built and 2) no more customization.

Congratulations on your new home! I know how anxious we were while we were waiting for our Lilac to be built! You're going to love it here!

The Buckeyes 05-15-2013 04:33 PM

Congratulations. We wil close on our Lily on Yearling Way on 5/24 so you are dealing with current info. We took 3 days on design 3-11 to 3-13 and signed on the 14th. Was informed that closing would be 5/24. On 3-18 we left the villages and said goodbye to a pile of dirt. On May 6th we received our last set of pictures of our completed home! Our Lily is block and stucco. If you can...bump out whatever is possible in regard to the property lines. Once it's built it would be rediculous to try it later. As for a birdcage you can always add this later (Just make sure you specify no utilities in the area you may want the birdcage) A birdcage will just add to your property taxes immediately. We will snowbird for a few years so a birdcage will come later. Also, even if you don't want the cost of an outdoor kitchen on the lanai....they can plumb it for you to complete later.

123Cookie 05-15-2013 07:18 PM

Quote:

Originally Posted by The Buckeyes (Post 676860)
Congratulations. We wil close on our Lily on Yearling Way on 5/24 so you are dealing with current info. We took 3 days on design 3-11 to 3-13 and signed on the 14th. Was informed that closing would be 5/24. On 3-18 we left the villages and said goodbye to a pile of dirt. On May 6th we received our last set of pictures of our completed home! Our Lily is block and stucco. If you can...bump out whatever is possible in regard to the property lines. Once it's built it would be rediculous to try it later. As for a birdcage you can always add this later (Just make sure you specify no utilities in the area you may want the birdcage) A birdcage will just add to your property taxes immediately. We will snowbird for a few years so a birdcage will come later. Also, even if you don't want the cost of an outdoor kitchen on the lanai....they can plumb it for you to complete later.

that is current info!!! Thank You -- what number on yearling - we will be on corner of yearling and Apache Crt. -- will have a 4ft. bump out on garage and a golf cart garage -- other than that pretty much standard from the outside. we are in will have our meeting at end of July - hope to be in by end of Sept. we are moving down permanently had enough of DC traffic!!!


All times are GMT -5. The time now is 05:37 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.