LucyP 10-27-2022 06:58 AM

They were there yesterday working on the road. I think few issues in play when they work on it or on hold for a reason.

retiredguy123 10-27-2022 07:03 AM

Quote:

Originally Posted by Stu from NYC (Post 2151389)
I am sure Lynette spent lots of time looking into this before wasting everyone time with a pathetic answer

I asked her for an update today, so she is probably busy working on it.

maistocars 10-27-2022 08:08 AM

The Villages would have completed that boondoggle within 2 weeks.

Stu from NYC 10-27-2022 08:48 AM

Quote:

Originally Posted by retiredguy123 (Post 2151552)
I asked her for an update today, so she is probably busy working on it.

Hope it does not interfere with her mid morning nap.

wbilbrey99@yahoo.com 10-27-2022 09:16 AM

Winter, you want winter go to Chicago or New York this should have been done already.

retiredguy123 10-27-2022 11:29 AM

Quote:

Originally Posted by retiredguy123 (Post 2151552)
I asked her for an update today, so she is probably busy working on it.

Here is the update she sent to me today.

"Currently active work for this job includes paving operations and storm drainage installations within the project limits.
The project limits are from Lake Ella Road to Avenida Central; I drove by the site a couple days ago and witnessed paving operations being done.
This project is estimated to be completed Fall of 2023.

For the latest project updates visit: 238395-5 U.S. 441 Widening from Lake Ella Road to Avenida Central (cflroads.com)

Kind regards,

Lynette Cruz | Community Outreach Coordinator
EXP U.S Services
In-House FDOT Consultant, District 5
Ocala/Leesburg Construction
Office: 352-326-7744 / 352-620-3020
Cell: 352-359-7059
Lynette.Cruz@dot.state.fl.us
www.cflroads.com"

CPD050 10-27-2022 12:30 PM

Quote:

Originally Posted by nn0wheremann (Post 2151541)
Supposedly the bride over Route 25 is the hang up. A worker died in a construction accident shortly after they started. More recently a sinkhole swallowed one or more of the bridge supports. Maybe it is haunted or cursed, this is the Deep South, doncha know.

Still, no excuse for not getting the rest of the work done. Those Bozos would never get away with the delay in Chicago for sure.

Chicago is horrible for construction projects. Always late for completion, sometimes by years, always over budget because certain people have to get their cut of the project. Then they use inferior quality material so it has to be redone well before it’s life expectancy. But at least the politicians get their kick back

DaleDivine 10-27-2022 03:36 PM

Quote:

Originally Posted by retiredguy123 (Post 2151647)
Here is the update she sent to me today.

"Currently active work for this job includes paving operations and storm drainage installations within the project limits.
The project limits are from Lake Ella Road to Avenida Central; I drove by the site a couple days ago and witnessed paving operations being done.
This project is estimated to be completed Fall of 2023.

For the latest project updates visit: 238395-5 U.S. 441 Widening from Lake Ella Road to Avenida Central (cflroads.com)

Kind regards,

Lynette Cruz | Community Outreach Coordinator
EXP U.S Services
In-House FDOT Consultant, District 5
Ocala/Leesburg Construction
Office: 352-326-7744 / 352-620-3020
Cell: 352-359-7059
Lynette.Cruz@dot.state.fl.us
www.cflroads.com"

There you go... An updated answer.
:oops::confused::icon_bored:

Worldseries27 10-27-2022 04:41 PM

Quote:

Originally Posted by nn0wheremann (Post 2151541)
supposedly the bride over route 25 is the hang up. A worker died in a construction accident shortly after they started. More recently a sinkhole swallowed one or more of the bridge supports. Maybe it is haunted or cursed, this is the deep south, doncha know.

Still, no excuse for not getting the rest of the work done. Those bozos would never get away with the delay in chicago for sure.

i say contract it out to the egyptians. They know how to build on sand

Worldseries27 10-27-2022 06:01 PM

Quote:

Originally Posted by wbilbrey99@yahoo.com (Post 2151606)
winter, you want winter go to chicago or new york this should have been done already.

chicago wins hands down with the hawk and lake michigan blizzards

Stu from NYC 10-27-2022 06:45 PM

Quote:

Originally Posted by retiredguy123 (Post 2151647)
Here is the update she sent to me today.

"Currently active work for this job includes paving operations and storm drainage installations within the project limits.
The project limits are from Lake Ella Road to Avenida Central; I drove by the site a couple days ago and witnessed paving operations being done.
This project is estimated to be completed Fall of 2023.

For the latest project updates visit: 238395-5 U.S. 441 Widening from Lake Ella Road to Avenida Central (cflroads.com)

Kind regards,

Lynette Cruz | Community Outreach Coordinator
EXP U.S Services
In-House FDOT Consultant, District 5
Ocala/Leesburg Construction
Office: 352-326-7744 / 352-620-3020
Cell: 352-359-7059
Lynette.Cruz@dot.state.fl.us
www.cflroads.com"

Wonder if they get paid by the day and that is why it takes so long


All times are GMT -5. The time now is 06:27 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.