![]() |
We paid the fee to close early (oh well, it was a mini-vacation) and were glad to be in early to get some stuff done. As far as the lighting, ask for an outlet above the cabinets and get rope lighting and run it along the edge of your cabinets. We did that at our other house and liked it a lot. Asking for more connections help when you are undecided as to what will go where. Easier beforehand.
|
Quote:
|
Quote:
We are building in Sanibel, behind the Captiva Rec Center. We are building a Begonia with a stretch lanai. Our back is to a villa wall. We will be closing on 12/29 on Raven Croft Terrace. Hope to see you at the pool!:wave: |
Home selections
Is it true that there are NO selections available on the Villas? Seems plugs and lighting would be important!
Thansk |
Quote:
|
Quote:
|
Quote:
|
All times are GMT -5. The time now is 10:26 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.