Target, Trailwinds Village to begin construction Target, Trailwinds Village to begin construction - Page 3 - Talk of The Villages Florida

Target, Trailwinds Village to begin construction

Closed Thread
Thread Tools
  #31  
Old 03-29-2023, 12:50 PM
coffeebean's Avatar
coffeebean coffeebean is offline
Sage
Join Date: Dec 2009
Location: Village of Mallory Square
Posts: 7,963
Thanks: 463
Thanked 4,354 Times in 2,013 Posts
Default

Quote:
Originally Posted by Michael 61 View Post
It just easier for me to jump on the turnpike and fly down to Clermont for the few times I need to get to a big box store. (And Costco will soon be there as well).
THAT is the one thing I'm so jealous of the folks down south. I would LOVE to be closer to Costco.
__________________
  #32  
Old 03-29-2023, 12:54 PM
coffeebean's Avatar
coffeebean coffeebean is offline
Sage
Join Date: Dec 2009
Location: Village of Mallory Square
Posts: 7,963
Thanks: 463
Thanked 4,354 Times in 2,013 Posts
Default

Quote:
Originally Posted by caylaboo View Post
Because The Villages probably does not want to pay to put a tunnel in. Maybe petitioning Trailwinds to do this in cooperation with The Villages would increase sales for all the stores and conveniences in this area.
Too late for a tunnel to be constructed. Would a bridge be a feasible option?
__________________
  #33  
Old 03-29-2023, 02:30 PM
Altavia Altavia is offline
Sage
Join Date: Jun 2019
Posts: 4,588
Thanks: 1,935
Thanked 3,521 Times in 1,687 Posts
Default

Quote:
Originally Posted by coffeebean View Post
Too late for a tunnel to be constructed. Would a bridge be a feasible option?
Aware of. any business with cart access not built on Villages properties?
Closed Thread

Tags
target, pages, village, begin, trailwinds


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 03:54 PM.