Quote:
Originally Posted by Bilyclub View Post
They are going to spend 1.38 million to fix erosion by the Morse bridge. The PWAC says the bridge is fine and the problem is erosion. "There is no problem with the bridge. There never has been. This is an erosion problem"

I guess that bumpy bridge deck is considered normal and won't be fixed?
The land upon which the bridge is built is the responsibility of the PWAC because that's they way it was set up. The road is the responsibility of Sumter County not the PWAC. So your They, meaning the PWAC is not the agency to complain about if you are unhappy with the road. Even if the PWAC felt the road needed fixing, it is not within their power to fix it.