![]() |
Morse Bridge to be fixed, but not the bridge?
They are going to spend 1.38 million to fix erosion by the Morse bridge. The PWAC says the bridge is fine and the problem is erosion. "There is no problem with the bridge. There never has been. This is an erosion problem"
I guess that bumpy bridge deck is considered normal and won't be fixed? |
That bridge was a horrible design. The MMP is way to narrow and the sidewalk doesn't extend to the whole bridge. I've seen many a golf cart hit that sidewalk where it begins and almost flip. Very dangerous bridge especially at night if don't realize that the sidewalk begins at the middle of the bridge.
|
Quote:
|
Quote:
|
Who cares close the bridge..
|
Quote:
|
Quote:
|
I find the bridge to be fine as long as you are careful. To widen the path any would eliminate one of the car lanes which will not happen as that will start the traffic complaints again.
|
Quote:
|
perhaps the expected upcoming $3 TRILLION Federal "Infrastructure Bill" will cover the Morse Bridge reconstruction. yeah sure.
|
Quote:
Regards From Jim Ignatowski :1rotfl::1rotfl: |
Quote:
|
How can the bridge be OK if it's foundation is eroding?
|
Quote:
|
Quote:
|
All times are GMT -5. The time now is 01:33 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.