Phase 1 as scheduled will allow all the extra truck traffic from the new Coleman industrial park to flow freely to 470 and I-75 to the west and the Turnpike to the east. Also, based on the drawing with the extra lanes and multi-use lanes there is going to be a lot of frontage lost by private owners along 301, like the junkyard, etc. I wonder if they are going to have turning lanes on either side for the trucks turning into all of the business along there.
|