![]() |
Quote:
|
Sub-par construction no doubt!
|
Bridge open
Quote:
|
The bridge actually opened at about 9:45am on Wednesday. I was able to drive across, and parked at Rohan, observing a worker checking out the underside of the bridge. Above the westbound lanes, there was a section where the structural steel was bent, and two lights were hanging loose. It looked like possibly a utility-type truck with an extendable bucket hit the steel framework. I would imagine there was far greater damage to whatever hit the bridge, than to the bridge itself. Kudos for getting the inspection done quickly, and avoiding further complications.
|
Quote:
|
Those sidewalk installers have large heavy equipment maneuvering around the base of the bridges.
|
44
Quote:
|
Quote:
|
Sub-Par construction on a bridge! Shirley, you jest. I don’t think so at all. Just someone who had an ACCIDENT, not an on Purpose. It would take more than a car hitting a support column to do any substantial damage, just trust me, I know. Travel the bridge with zero concern for your safety due to this incident, I will.
|
Quote:
:icon_wink: |
Open now
Quote:
|
Quote:
|
According to the Sun it was a dump truck. How do they raise into the up position without the driver knowing ?
|
Quote:
|
Quote:
|
All times are GMT -5. The time now is 05:39 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.