Rodneysblue 04-13-2023 09:41 AM

Most recent Update:
Just heard on WVGL that the bridge will be closed until further notice. This was at 10:38am 4/13/2023.

hizzonner 04-13-2023 10:03 AM

Could be years……
 
Quote:

Originally Posted by Keefelane66 (Post 2206514)
If it's anything like the DOT paving project on 44 could it take months?
Wonder who will be the first to cross 44 at the light

Or if it’s anything like the highway rebuild on 441/27 in Spanish Springs it could be years! I’ve never seen anything like that project! Like 4 or more years!

Seashell88 04-13-2023 04:16 PM

It is open now

EdFNJ 04-13-2023 06:31 PM

Quote:

Originally Posted by hizzonner (Post 2206901)
Or if it’s anything like the highway rebuild on 441/27 in Spanish Springs it could be years! I’ve never seen anything like that project! Like 4 or more years!

Almost 2 years were lost with virtually no work being done during the pandemic which didn't help. The pandemic was supposed to help SPEED construction in the state due to reducded traffic according to the governator at the peak of the pandemic. Same thing was said about the I-4 project but it didn't probably because they couldn't get enough help.

NoMoSno 04-13-2023 06:36 PM

Quote:

Originally Posted by EdFNJ (Post 2207039)
Almost 2 years were lost with virtually no work being done during the pandemic which didn't help. The pandemic was supposed to help SPEED construction in the state due to reducded traffic according to the governator at the peak of the pandemic. Same thing was said about the I-4 project but it didn't probably because they couldn't get enough help.

The project is only 5 months off schedule.
It has always been a predicted 3-year project.
Tho I don't know why they don't work through the night.
238395-5 U.S. 441 Widening from Lake Ella Road to Avenida Central

coffeebean 04-13-2023 09:46 PM

Quote:

Originally Posted by maistocars (Post 2206810)
Months? Look no further than 27/441 by Sams Club and the years it is taking to complete and there is no end in sight.

My thoughts exactly.

WhoDat 04-16-2023 02:48 PM

Crossed the bridge yesterday afternoon around 6 PM.

kcrazorbackfan 04-16-2023 04:34 PM

This thread is still open and the bridge has been open for over a week?


All times are GMT -5. The time now is 06:23 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.