Engineers will love this story Engineers will love this story - Talk of The Villages Florida

Engineers will love this story

Closed Thread
Thread Tools
  #1  
Old 12-06-2011, 10:19 AM
eweissenbach's Avatar
eweissenbach eweissenbach is offline
Sage
Join Date: Dec 2009
Location: Smithville (Kansas City) Mo./ LaBelle North
Posts: 4,572
Thanks: 113
Thanked 733 Times in 229 Posts
Send a message via AIM to eweissenbach
Default Engineers will love this story

A toothpaste factory had a problem: they sometimes shipped empty boxes, without the tube inside. This was due to the way the production line was set up, and people with experience in designing production lines will tell you how difficult it is to have everything happen with timings so precise that every single unit coming out of it is perfect 100% of the time. Small variations in the environment (which can’t be controlled in a cost-effective fashion) mean you must have quality assurance checks smartly distributed across the line so that customers all the way down to the supermarket don’t get hacked off and buy another product instead.

Understanding how important that was, the CEO of the toothpaste factory got the top people in the company together and they decided to start a new project, in which they would hire an external engineering company to solve their empty boxes problem, as their engineering department was already too stretched to take on any extra effort.

The project followed the usual process: budget and project sponsor allocated, RFP, third-parties selected, and six months (and $8 million) later they had a fantastic solution — on time, on budget, high quality and everyone in the project had a great time. They solved the problem by using high-tech precision scales that would sound a bell and flash lights whenever a toothpaste box would weigh less than it should. The line would stop, and someone had to walk over and yank the defective box out of it, pressing another button when done to re-start the line.

A while later, the CEO decides to have a look at the ROI of the project: amazing results! No empty boxes ever shipped out of the factory after the scales were put in place. Very few customer complaints, and they were gaining market share. “That’s some money well spent!” – he says, before looking closely at the other statistics in the report.

It turns out, the number of defects picked up by the scales was 0 after three weeks of production use. It should’ve been picking up at least a dozen a day, so maybe there was something wrong with the report. He filed a bug against it, and after some investigation, the engineers come back saying the report was actually correct. The scales really weren't picking up any defects, because all boxes that got to that point in the conveyor belt were good.

Puzzled, the CEO travels down to the factory, and walks up to the part of the line where the precision scales were installed.

A few feet before the scale, there was a $20 desk fan, blowing the empty boxes out of the belt and into a bin.

“Oh, that,” says one of the workers — “one of the guys put it there ’cause he was tired of walking over….. “every time the bell rang”.
__________________
Oldcoach Ed
"You cannot direct the wind, but you can adjust the sails" "Be yourself - everyone else is taken"
  #2  
Old 12-06-2011, 10:39 AM
quirky3's Avatar
quirky3 quirky3 is offline
Platinum member
Join Date: Jan 2011
Posts: 1,696
Thanks: 0
Thanked 2 Times in 2 Posts
Default Great Story!

Quote:
Originally Posted by eweissenbach View Post
A toothpaste factory had a problem: they sometimes shipped empty boxes, without the tube inside. This was due to the way the production line was set up, and people with experience in designing production lines will tell you how difficult it is to have everything happen with timings so precise that every single unit coming out of it is perfect 100% of the time. Small variations in the environment (which can’t be controlled in a cost-effective fashion) mean you must have quality assurance checks smartly distributed across the line so that customers all the way down to the supermarket don’t get hacked off and buy another product instead.

Understanding how important that was, the CEO of the toothpaste factory got the top people in the company together and they decided to start a new project, in which they would hire an external engineering company to solve their empty boxes problem, as their engineering department was already too stretched to take on any extra effort.

The project followed the usual process: budget and project sponsor allocated, RFP, third-parties selected, and six months (and $8 million) later they had a fantastic solution — on time, on budget, high quality and everyone in the project had a great time. They solved the problem by using high-tech precision scales that would sound a bell and flash lights whenever a toothpaste box would weigh less than it should. The line would stop, and someone had to walk over and yank the defective box out of it, pressing another button when done to re-start the line.

A while later, the CEO decides to have a look at the ROI of the project: amazing results! No empty boxes ever shipped out of the factory after the scales were put in place. Very few customer complaints, and they were gaining market share. “That’s some money well spent!” – he says, before looking closely at the other statistics in the report.

It turns out, the number of defects picked up by the scales was 0 after three weeks of production use. It should’ve been picking up at least a dozen a day, so maybe there was something wrong with the report. He filed a bug against it, and after some investigation, the engineers come back saying the report was actually correct. The scales really weren't picking up any defects, because all boxes that got to that point in the conveyor belt were good.

Puzzled, the CEO travels down to the factory, and walks up to the part of the line where the precision scales were installed.

A few feet before the scale, there was a $20 desk fan, blowing the empty boxes out of the belt and into a bin.

“Oh, that,” says one of the workers — “one of the guys put it there ’cause he was tired of walking over….. “every time the bell rang”.
I come from a long line of engineers and Quality Control people. Great Story! There's no substitute for common sense!
__________________
"Carpe the heck out of your Diems- with joy!"

"Do no harm" (but take no sh**!)
  #3  
Old 12-06-2011, 12:29 PM
CaptJohn's Avatar
CaptJohn CaptJohn is offline
Gold member
Join Date: Oct 2011
Location: Mobile, Alabama; Pensacola, FL; Gulf Breeze, FL
Posts: 1,222
Thanks: 0
Thanked 1 Time in 1 Post
Default

Great story! I work in an engineering department and fortunately our guys all have common sense but we have to deal with outsiders who don't and can and do overide us.
__________________
Courtesy is Contagious.
*
In theory, theory and reality are the same.
In reality, they're different!
  #4  
Old 12-07-2011, 07:06 AM
larbud larbud is offline
Soaring Eagle member
Join Date: Oct 2011
Posts: 2,035
Thanks: 383
Thanked 876 Times in 298 Posts
Default

Engineers never make mistakes! They make design modifications!
  #5  
Old 12-07-2011, 07:27 AM
getdul981's Avatar
getdul981 getdul981 is offline
Platinum member
Join Date: May 2010
Location: Roanoke, VA - Pennecamp - St. James
Posts: 1,929
Thanks: 0
Thanked 1 Time in 1 Post
Default

If you want to find the easiest way to do something, give the job to the laziest person.
__________________
Greg

A pessimist is an optimist with experience.

"In my many years I have come to a conclusion that one useless man is a shame, two is a law firm and three or more is a congress." - John Adams
Closed Thread


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 09:50 AM.