Old 12-01-2014, 09:29 AM
richhor richhor is offline
Junior Member
Join Date: Jul 2011
Posts: 9
Thanks: 0
Thanked 0 Times in 0 Posts
Default 466A to 301

I have lived here for the last three years and for the life of me I can't figure out why the connection from 466A to 301 in Wildwood can't get finished. There must be some crazy reason for having 466A closed so long.
  #2  
Old 12-01-2014, 09:32 AM
villagetinker's Avatar
villagetinker villagetinker is offline
Sage
Join Date: Sep 2013
Location: Village of Pinellas
Posts: 11,093
Thanks: 3
Thanked 8,221 Times in 2,985 Posts
Default

Amen! We moved in last October just a work started. As I recall it was supposed to be completed in 1 year. Last I heard was December.....
__________________
Pennsylvania, for 60+ years, most recently, Allentown, now TV.
  #3  
Old 12-01-2014, 09:48 AM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,840
Thanks: 1,013
Thanked 11,036 Times in 4,217 Posts
Default

Keeping Villager drivers out of WW.
  #4  
Old 12-01-2014, 10:23 AM
Indydealmaker's Avatar
Indydealmaker Indydealmaker is offline
Sage
Join Date: Jun 2010
Location: Bonita
Posts: 2,516
Thanks: 158
Thanked 408 Times in 207 Posts
Default

Quote:
Originally Posted by richhor View Post
I have lived here for the last three years and for the life of me I can't figure out why the connection from 466A to 301 in Wildwood can't get finished. There must be some crazy reason for having 466A closed so long.
You are just spoiled. You are too used to projects managed by The Villages being finished before they are even started.
__________________
Real Name: Steven Massy Arrived at TV through Greenwood, IN; Moss Beach, CA; La Grange, KY; Crystal River, FL; The Villages, FL
  #5  
Old 12-01-2014, 12:27 PM
applesoffh applesoffh is offline
Veteran member
Join Date: Oct 2011
Posts: 606
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Some of the ladies at the Wildwood post office live in that area and said that the construction has stopped because of lawsuits from homeowners regarding property damage. Cars seem to be able to go down to a certain point now, but the area surrounding the intersection hasn't been touched in months. Since they live in that area they might be on to something. Perhaps someone at Wildwood City Hall has a more definitive answer.

In the meantime, take Powell to Huey Street and make a right, or take 44A into Wildwood. Both will take you to 301 or the shopping mall there. Very easy.
  #6  
Old 12-01-2014, 04:09 PM
Shimpy's Avatar
Shimpy Shimpy is offline
Sage
Join Date: Aug 2008
Posts: 2,736
Thanks: 4
Thanked 26 Times in 21 Posts
Default

Quote:
Originally Posted by Indydealmaker View Post
You are just spoiled. You are too used to projects managed by The Villages being finished before they are even started.
This is true.....If that short section of road was done by Villages crews it would be done in a month. Apparently they are using the same people that did 441/27 and took several years.
__________________
Les
  #7  
Old 12-01-2014, 04:31 PM
LndLocked LndLocked is offline
Veteran member
Join Date: Nov 2012
Posts: 859
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Their is a MAJOR difference in putting in underground infrastructure and building roads in basically virgin land, that was only ever used to grow hay .... and trying to deal with multiple property owners and finding that existing underground utilities are not where they are shown to be on the prints of previous construction.

Road construction crew NEVER know what they are actually going to find once they start digging and every found unknown is a delay.
  #8  
Old 12-01-2014, 04:47 PM
richhor richhor is offline
Junior Member
Join Date: Jul 2011
Posts: 9
Thanks: 0
Thanked 0 Times in 0 Posts
Default

The Super Dome was built in less time and that is in the heart of a major city!!!!
  #9  
Old 12-01-2014, 04:54 PM
Cisco Kid's Avatar
Cisco Kid Cisco Kid is offline
Platinum member
Join Date: Aug 2012
Location: Monticello IL
Posts: 1,886
Thanks: 9
Thanked 3 Times in 3 Posts
Default

If dogs are allowed in cars that use that road I am not going to drive one it.
__________________
My alarm doesn't have a snooze button. It has a paw.

Chloe
&
Lulu
  #10  
Old 12-01-2014, 04:59 PM
yabbadu yabbadu is offline
Veteran member
Join Date: May 2013
Posts: 569
Thanks: 1
Thanked 94 Times in 49 Posts
Default

Ten Miles plus of Freeway could be built up North in half the time as this project!
  #11  
Old 12-01-2014, 05:01 PM
nkrifats
Guest
Posts: n/a
Default

Quote:
Originally Posted by yabbadu View Post
Ten Miles plus of Freeway could be built up North in half the time as this project!
I don't think so!
  #12  
Old 12-01-2014, 05:10 PM
slipcovers slipcovers is offline
Senior Member
Join Date: Mar 2014
Posts: 374
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by nkrifats View Post
I don't think so!
You took the words right out of my mouth.
  #13  
Old 12-01-2014, 05:21 PM
cattywampus cattywampus is offline
Senior Member
Join Date: Jul 2014
Posts: 153
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by richhor View Post

The Super Dome was built in less time and that is in the heart of a major city!!!!
HUH ????.

Uncle B. started construction on August 11 1971.
Finished in August 1975...Took 4 years to build The Superdome.

It Opened 7 months after Super Bowl 9 was scheduled to be played there.

Estimated to cost $ 46 Million...ACTUAL total cost came in at $ 165 Million.

.
  #14  
Old 12-01-2014, 06:20 PM
justjim justjim is offline
Sage
Join Date: Feb 2012
Location: Illinois, Tennesee, Florida, Village of Caroline, Sanibel, LaBelle
Posts: 6,133
Thanks: 60
Thanked 1,765 Times in 747 Posts
Default

Quote:
Originally Posted by applesoffh View Post
Some of the ladies at the Wildwood post office live in that area and said that the construction has stopped because of lawsuits from homeowners regarding property damage. Cars seem to be able to go down to a certain point now, but the area surrounding the intersection hasn't been touched in months. Since they live in that area they might be on to something. Perhaps someone at Wildwood City Hall has a more definitive answer.

In the meantime, take Powell to Huey Street and make a right, or take 44A into Wildwood. Both will take you to 301 or the shopping mall there. Very easy.
"Lawsuits from property owners" should not stop construction at this point in time. There must be other problems---such as contractor bankruptcy. Not a major problem as pointed out that there are alternative roads into Wildwood.
__________________
Most people are as happy as they make up their mind to be. Abraham Lincoln
  #15  
Old 12-01-2014, 06:22 PM
dbussone's Avatar
dbussone dbussone is offline
Sage
Join Date: Jun 2012
Posts: 7,833
Thanks: 0
Thanked 88 Times in 80 Posts
Default

Quote:
Originally Posted by Cisco Kid View Post
If dogs are allowed in cars that use that road I am not going to drive one it.

What if they are approved by the Feds as therapy dogs?
__________________
All the great things are simple, and many can be expressed in a single word: freedom, justice, honor, duty, mercy, hope.
Winston Churchill
Closed Thread


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 03:15 PM.