Repairs scheduled for Saddlebrook Multi-Modal Path Repairs scheduled for Saddlebrook Multi-Modal Path - Talk of The Villages Florida

Repairs scheduled for Saddlebrook Multi-Modal Path

Closed Thread
Thread Tools
  #1  
Old 05-05-2024, 09:05 PM
The Gazette's Avatar
The Gazette The Gazette is offline
Editor
Join Date: Jul 2021
Location: The Villages Florida
Posts: 1,182
Thanks: 0
Thanked 556 Times in 363 Posts
Default Repairs scheduled for Saddlebrook Multi-Modal Path

District Property Management will be performing repairs along the multi-modal path between the south side of Saddlebrook Recreation Center to the north side of Tunnel B10 (under 466A). The multi-modal path will be blocked off and a detour will be visibly marked. The detour will run along the concrete pathway of the Saddlebrook Executive Golf

More...
  #2  
Old 05-06-2024, 08:08 AM
Bay Kid's Avatar
Bay Kid Bay Kid is offline
Sage
Join Date: Feb 2013
Location: The Villages and the Northern Neck on the Chesapeake Bay, VA.
Posts: 6,250
Thanks: 1,704
Thanked 3,533 Times in 1,577 Posts
Default

Great! Beautiful ride but terrible road.
  #3  
Old 05-07-2024, 04:26 AM
Harold.wiser Harold.wiser is offline
Member
Join Date: Nov 2021
Posts: 73
Thanks: 13
Thanked 90 Times in 39 Posts
Default

This path is always in need of repair!
Original post should say tunnel under 466, not 466A.
  #4  
Old 05-07-2024, 11:32 AM
TomSpasm TomSpasm is offline
Senior Member
Join Date: Jan 2012
Location: Haciendas of Mission Hills
Posts: 155
Thanks: 0
Thanked 63 Times in 41 Posts
Default

It's under 466, not 466A.
Closed Thread


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 09:52 AM.