Hi all... Just wondering if 466a is now open between Powell and 301.
  #2  
Old 04-21-2015, 12:26 PM
drdodge drdodge is offline
Senior Member
Join Date: Oct 2007
Location: Springdale, Fairlawn villas
Posts: 460
Thanks: 0
Thanked 0 Times in 0 Posts
Default

no it is not still has a detour
__________________
drd
  #3  
Old 04-21-2015, 12:35 PM
SouthOfTheBorder's Avatar
SouthOfTheBorder SouthOfTheBorder is offline
Veteran member
Join Date: Jun 2013
Posts: 497
Thanks: 1
Thanked 4 Times in 3 Posts
Default

Apparently it is now open:

466a

Don
__________________
Look both ways before crossing.

Western PA, Marietta GA, finally TV....
  #4  
Old 04-21-2015, 02:08 PM
billethkid's Avatar
billethkid billethkid is offline
Sage
Join Date: Jul 2007
Posts: 18,536
Thanks: 0
Thanked 4,871 Times in 1,420 Posts
Default

Yes it is open as I went through that way early this morning.
But it is a long way from being done. Still cones separating everything except the outside left and right lanes....one in each direction.
The islands are not done.
The paving is not done.

Open but not done!
All they did was create a passage through the construction zone.
  #5  
Old 04-21-2015, 03:06 PM
GPGuar GPGuar is offline
Senior Member
Join Date: Sep 2011
Posts: 196
Thanks: 696
Thanked 65 Times in 37 Posts
Default

Quote:
Originally Posted by billethkid View Post
Yes it is open as I went through that way early this morning.
But it is a long way from being done. Still cones separating everything except the outside left and right lanes....one in each direction.
The islands are not done.
The paving is not done.

Open but not done!
All they did was create a passage through the construction zone.
Thanks Bill for the update, I was under the impression that the job was completed. Well at least we can get through to 301.... it's a start anyway.
  #6  
Old 04-21-2015, 03:50 PM
Chi-Town's Avatar
Chi-Town Chi-Town is offline
Sage
Join Date: Dec 2009
Posts: 7,506
Thanks: 192
Thanked 1,484 Times in 717 Posts
Default

Going east from 301 it's open but hardly a smooth ride.
  #7  
Old 04-21-2015, 05:07 PM
Chazz Chazz is offline
Senior Member
Join Date: Jun 2008
Posts: 427
Thanks: 0
Thanked 0 Times in 0 Posts
Default

I still saw the "Road Closed" sign up, this morning, at the 466A/Powell Rd intersection.
__________________
The Bronx, NY<br />Queens, NY<br />Old Bridge, NJ<br />Freehold, NJ<br />The Villages, FL
  #8  
Old 04-21-2015, 05:13 PM
JoMar JoMar is offline
Sage
Join Date: Apr 2014
Posts: 4,983
Thanks: 10
Thanked 2,481 Times in 943 Posts
Default

Below 466A it's easier to go 44A.
__________________
No one believes the truth when the lie is more interesting

Berks County Pennsylvania
  #9  
Old 04-21-2015, 06:04 PM
CFrance's Avatar
CFrance CFrance is offline
Sage
Join Date: Dec 2011
Location: Tamarind Grove/Monpazier, France
Posts: 14,705
Thanks: 390
Thanked 2,132 Times in 877 Posts
Default

Quote:
Originally Posted by billethkid View Post
Yes it is open as I went through that way early this morning.
But it is a long way from being done. Still cones separating everything except the outside left and right lanes....one in each direction.
The islands are not done.
The paving is not done.

Open but not done!
All they did was create a passage through the construction zone.
At this point, just being able to get through and exit on 301 is a plus. They still intend to close 462 at the railroad tracks.
__________________
It's harder to hate close up.
  #10  
Old 04-21-2015, 07:54 PM
golf2140 golf2140 is offline
Platinum member
Join Date: May 2009
Location: Bonita
Posts: 1,871
Thanks: 1
Thanked 26 Times in 13 Posts
Default

That contractor should be ashamed of this job. It's still a mess, but yes open
__________________
Villager from 2000 until they take me out in a small box!!!
  #11  
Old 04-22-2015, 06:46 AM
RickeyD's Avatar
RickeyD RickeyD is offline
Soaring Eagle member
Join Date: Sep 2014
Posts: 2,403
Thanks: 0
Thanked 5 Times in 5 Posts
Default

Quote:
Originally Posted by golf2140 View Post
That contractor should be ashamed of this job. It's still a mess, but yes open

A contractor "ashamed" ? It seems you have no construction industry exposure. [emoji57]
  #12  
Old 04-22-2015, 07:20 AM
SoccerCoach SoccerCoach is offline
Senior Member
Join Date: Sep 2010
Location: CT, AZ, FL, GA, WV, VA, CT, Hemingway
Posts: 231
Thanks: 0
Thanked 1 Time in 1 Post
Send a message via ICQ to SoccerCoach
Default

Seems like not enough "RESEARCH" was done before AWARDING this contractor with the project. Does this have to be approved by the county before being open to traffic??
No penalties assessed?? Might be a lesson in here someplace.
__________________
I am who I am for a reason
  #13  
Old 04-22-2015, 08:13 AM
looneycat's Avatar
looneycat looneycat is offline
Gold member
Join Date: Feb 2012
Posts: 1,117
Thanks: 0
Thanked 4 Times in 4 Posts
Default

Quote:
Originally Posted by SoccerCoach View Post
Seems like not enough "RESEARCH" was done before AWARDING this contractor with the project. Does this have to be approved by the county before being open to traffic??
No penalties assessed?? Might be a lesson in here someplace.
what information do you have to blame the contractor, Are you privy to all the unexpected problems encountered once the project started. Did you know that once the excavation was done it became obvious that all the underground utilities needed to be redone (gas lines, water, etc,) and once that was found rights of way had to be established....no I wouldn't blame the contractor...try blaming local politicos instead for not maintaining local utilities and facilitating right of way issues,
__________________
I observe all things, I just don't give a damn about most!
looneycat
  #14  
Old 04-22-2015, 08:18 AM
CFrance's Avatar
CFrance CFrance is offline
Sage
Join Date: Dec 2011
Location: Tamarind Grove/Monpazier, France
Posts: 14,705
Thanks: 390
Thanked 2,132 Times in 877 Posts
Default

It's open. It's over. I'm glad. Now they can close the RR tracks on 462 for three weeks or longer, and I can still get to DDRR without detouring to Huey-Dooey-Looey St.
__________________
It's harder to hate close up.
  #15  
Old 04-22-2015, 08:25 AM
Trish Miller's Avatar
Trish Miller Trish Miller is offline
Senior Member
Join Date: Mar 2011
Posts: 296
Thanks: 3
Thanked 3 Times in 3 Posts
Default

Its easier to take 462 to 301