New Construction Update Video

Closed Thread
Thread Tools
  #1  
Old 03-05-2020, 06:28 AM
Goldwingnut's Avatar
Goldwingnut Goldwingnut is offline
Platinum member
Join Date: Apr 2014
Location: Village of Hillsborough
Posts: 1,625
Thanks: 2,361
Thanked 3,519 Times in 712 Posts
Default New Construction Update Video

Here's the latest look at construction including the Villages of Chitty Chatty and De Luna as well as a look at the connectivity issue between the two parts of The Villages including my 2 cents on what is going on and what is coming.

Construction Update Video 3-2-20
__________________
Don Wiley
GoldWingNut (a motorcycle enthusiast not a gilded fastener)
Village of Hillsborough
www.goldwingnut.com
YouTube –YouTube.com/GoldWingnut and YouTube.com/GoldWingnutProductions
Carpe diem quam minimum credula postero
Society is produced by our wants, and government by wickedness; the former promotes our happiness positively by uniting our affections, the latter negatively by restraining our vices. - Thomas Paine, 1/10/1776
  #2  
Old 03-05-2020, 07:21 AM
tghoul tghoul is offline
Senior Member
Join Date: Nov 2007
Posts: 255
Thanks: 0
Thanked 25 Times in 15 Posts
Default Lofts

The Lofts rent includes one free reserved outdoor parking space but garages are extra.
  #3  
Old 03-05-2020, 07:34 AM
MrExcite721 MrExcite721 is offline
Member
Join Date: Jun 2019
Posts: 69
Thanks: 47
Thanked 31 Times in 16 Posts
Default

Thanks Don, delayed crickets at Magnolia Plaza was brilliant!
  #4  
Old 03-05-2020, 11:29 AM
OCsun's Avatar
OCsun OCsun is offline
Senior Member
Join Date: Jul 2011
Posts: 419
Thanks: 31
Thanked 66 Times in 27 Posts
Default

Thanks Don,

It is so easy for me to understand the logic behind the building process after I see your videos. Thanks for sharing!
  #5  
Old 03-05-2020, 12:30 PM
Altavia Altavia is offline
Sage
Join Date: Jun 2019
Posts: 3,404
Thanks: 1,441
Thanked 2,783 Times in 1,245 Posts
Default

Interesting thinking that a golf cart lane on the Warm Springs turnpike bridge might be in the plans.
  #6  
Old 03-05-2020, 02:04 PM
VillageIdiots VillageIdiots is offline
Senior Member
Join Date: Jul 2017
Posts: 335
Thanks: 0
Thanked 32 Times in 16 Posts
Default

Don, I agree with your logic on the connectivity over to Rohan. However, I'm not sure I agree that will be the primary and/or only route to the western (Brownwood) side, which is where they need to push the people and the money to from the Southern Oaks area - hence that big piece of iron that has been sitting beside the turnpike for months. In your video you used the word vague about communication. I don't think I would use that word to describe it. Evasive might be a better description. There is nothing vague about printing "January 2020" on maps that were available to the public. There was nothing vague about the Vmail that came out a few months ago stating the connectivity would be completed in April/May 2020. And the article in last week's paper that stated the bridges would be complete by end of 2020 was not vague. Keep in mind that "complete" and "opened" are two different things. What bugs me most about the whole thing as, as the dates have slid, no communications have acknowledged the slide, provided any reasons for the slide, or build any confidence in the latest time frame given. Many of us are just fine without the connectivity but are looking forward to it when we get it. It's just the transparency, or lack thereof, that has been the most disappointing.

Great job, as usual, on the excellent and informative videos.
  #7  
Old 03-05-2020, 02:28 PM
Bogie Shooter Bogie Shooter is offline
Sage
Join Date: Sep 2008
Posts: 18,874
Thanks: 11
Thanked 5,368 Times in 2,396 Posts
Default

I would suggest you take your complaining to the multitude of threads available for that topic and leave this thread clean.
Quite frankly I think Don can use whatever words he wants.
__________________
The further a society drifts from truth the more it will hate those who speak it. George Orwell.
“Only truth and transparency can guarantee freedom”, John McCain
  #8  
Old 03-05-2020, 02:36 PM
VillageIdiots VillageIdiots is offline
Senior Member
Join Date: Jul 2017
Posts: 335
Thanks: 0
Thanked 32 Times in 16 Posts
Default

Quote:
Originally Posted by Bogie Shooter View Post
I would suggest you take your complaining to the multitude of threads available for that topic and leave this thread clean.
Quite frankly I think Don can use whatever words he wants.
Wow, interesting take from someone with those particular quotes in their sig line. For the record, I appreciate what Don does and even appreciate the degree to which he has to toe the line on certain things. I'm certainly not complaining about him and I'm not even complaining about the connectivity. As your quote's point out, a little transparency goes a long way, and that's all I'm looking for - but I know it's not Don that is denying it.
  #9  
Old 03-05-2020, 04:04 PM
Goldwingnut's Avatar
Goldwingnut Goldwingnut is offline
Platinum member
Join Date: Apr 2014
Location: Village of Hillsborough
Posts: 1,625
Thanks: 2,361
Thanked 3,519 Times in 712 Posts
Default

Yes, perhaps vague may not have been the most accurate of words to use. Certainly there is a lack of transparency and forthrightness about the schedule changes. The January 2020 was clearly an advertising push, then to slide in the back handed announcement of April/May was an "oh by the way", a month ago it was the bridges would be "set" in 2020 (the Brownwood bridge has been set since Aug 22 2019) was a deliberate choice of words for appeasement, last weeks announcement is as stated above not that the connectivity will be in place, only that the bridges would be done. All made with carefully chosen words if one listens, and never making a commitment.

I could talk at length of the carefully planned building of the 2nd Warm Springs span over the turnpike, its timing and the timing of pushing for improvement of the US301 exit , subsequent reclaiming of the donated land for the exit, and then rapidly submitted permitting for the current work on all 4 corners forever ending the exit debate. This was all a very carefully played game of chess for which The Villages are Grand Masters of the game.

The connecting to Brownwood is obviously an unavoidable problem for them now, but using the Warm Springs bridge as I've described quickly puts to rest the "Connectivity" issue. You can get to Brownwood from Rohan via Morse-Hillsborough Trail-Buena Vista, but it may add a few minutes to the trip.

A final thought, does it make sense that they would put two shopping and commercial areas so close (opposite side of the turnpike) and then require a huge detour just to get across the turnpike. From Magnolia Plaza to the Water Lily bridge then back to Warm Springs Avenue is the equivalent distance of trying to cross 466 at Laurel Manner to get to the Saddlebrook course by going all the way down to the High School and crossing and then coming back. Or going south to the Baxley bridge is like trying to cross 466 at Morse by going down to Bob Evans West of Buena Vista and back. Neither route seems a viable option and connectivity as I've proposed is a logical conclusion that avoids these protracted detours.

We shall see what time brings, if it happens then you know where you heard it first. If it doesn't then I'm wrong, but don't tell my wife or I'll never live it down.
__________________
Don Wiley
GoldWingNut (a motorcycle enthusiast not a gilded fastener)
Village of Hillsborough
www.goldwingnut.com
YouTube –YouTube.com/GoldWingnut and YouTube.com/GoldWingnutProductions
Carpe diem quam minimum credula postero
Society is produced by our wants, and government by wickedness; the former promotes our happiness positively by uniting our affections, the latter negatively by restraining our vices. - Thomas Paine, 1/10/1776
  #10  
Old 03-06-2020, 04:52 AM
stings stings is offline
Member
Join Date: Aug 2014
Posts: 96
Thanks: 61
Thanked 69 Times in 34 Posts
Default

Thanks for the great update. Your supposition of the Warm Springs golf car MMP makes a lot of sense. I’ve been thinking that the obvious new push for Chitty Chatty/Bradford and the bridge adjacent to Rohan that this was where the initial connectivity would happen. Gets around possible FDOT approvals for Waterlily/Bixley for the time being while at least giving full, although not “perfect”, connectivity.
  #11  
Old 03-06-2020, 07:13 AM
Pedrocarrasco01@yahoo.com Pedrocarrasco01@yahoo.com is offline
Senior Member
Join Date: Aug 2019
Posts: 225
Thanks: 2,364
Thanked 251 Times in 109 Posts
Default

Wow, thank you Gold Wing Nut for the video and helpful explanation
  #12  
Old 03-06-2020, 07:21 AM
Jewelz's Avatar
Jewelz Jewelz is offline
Senior Member
Join Date: Sep 2018
Location: The Village of Tamarind Grove
Posts: 152
Thanks: 416
Thanked 118 Times in 67 Posts
Default Thanks

Thanks so much Don- we always look forward to your updates!!
  #13  
Old 03-06-2020, 07:49 AM
Bay Kid's Avatar
Bay Kid Bay Kid is offline
Sage
Join Date: Feb 2013
Location: The Villages and the Northern Neck on the Chesapeake Bay, VA.
Posts: 5,451
Thanks: 1,635
Thanked 3,112 Times in 1,344 Posts
Default

Amazing how huge TVs is becoming. Thank you for the update.
  #14  
Old 03-06-2020, 08:11 AM
dougjb dougjb is offline
Senior Member
Join Date: Jan 2016
Posts: 208
Thanks: 85
Thanked 364 Times in 112 Posts
Default

That was wonderful! Thank you for your work in putting this together.
  #15  
Old 03-06-2020, 08:14 AM
Rwirish Rwirish is offline
Veteran member
Join Date: Dec 2016
Posts: 846
Thanks: 4
Thanked 875 Times in 388 Posts
Default

Thanks so much for doing this. Any photos/updates on the new Championship Golf Course?
Closed Thread

Tags
construction, villages, including, video, update


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 01:09 PM.