The Villages Construction Update #141 - The Village of Well Point under construction! The Villages Construction Update #141 - The Village of Well Point under construction! - Page 2 - Talk of The Villages Florida

The Villages Construction Update #141 - The Village of Well Point under construction!

Closed Thread
Thread Tools
  #16  
Old 05-23-2024, 05:54 PM
Shipping up to Boston Shipping up to Boston is offline
Platinum member
Join Date: Feb 2024
Location: South Harmon Institute of Technology
Posts: 1,972
Thanks: 2
Thanked 925 Times in 561 Posts
Default

Quote:
Originally Posted by Maker View Post
You seemed to wonder why the shift to building Wellpoint...
There are a few dots popping up, and what if they are connected like this.
Megisson/Morse tunnel being inspected for sinkholes. It's so new, why the concern? Thinking there are structural problems observed and using ground penetrating radar is not normally needed unless they are looking for something very serious.
Golf cart travel to Sawgrass, and points south needs that tunnel. If that tunnel is closed long term, what alternatives are available?
Corbin Trail could be the link they will need. But it's blocked off for construction.

So what if developer has had some information (for many months) that points to a long term closure of that tunnel?
Recognizing the need for golf cart connectivity between everything being built south, to Brownwood, stores, gasoline, etc,... he shifted focus upon getting Wellpoint done asap so he can open Corbin and McNeil.

Thoughts?
Wonder if another bridge is in the works over the turnpike. Maybe Warm Springs Rd?
That's quite a take....something tells me you might have some sources
  #17  
Old 05-23-2024, 08:32 PM
Altavia Altavia is offline
Sage
Join Date: Jun 2019
Posts: 4,606
Thanks: 1,938
Thanked 3,538 Times in 1,697 Posts
Default

Some of the streets in Wellpoint as well as McNeill are now showing on the Villages map.
Attached Thumbnails
The Villages Florida: Click image for larger version

Name:	IMG_0453.jpg
Views:	475
Size:	35.7 KB
ID:	104235   The Villages Florida: Click image for larger version

Name:	IMG_0454.jpg
Views:	437
Size:	31.3 KB
ID:	104236  

Last edited by Altavia; 05-23-2024 at 08:44 PM.
  #18  
Old 05-24-2024, 06:54 AM
Normal's Avatar
Normal Normal is offline
Soaring Eagle member
Join Date: Jun 2021
Location: Earth
Posts: 2,492
Thanks: 5,360
Thanked 1,838 Times in 897 Posts
Default Maybe Not

Quote:
Originally Posted by Altavia View Post
Interesting theory.

At least the southern Warm Springs bridge is not wide enough to add 4 lanes to the Turnpike so will need be replaced. But that's probably 3+ years away.
They don’t have to drop the bridge at Warm Springs? It already seems wide enough?

We will probably see the clover leaf design at 470? Traffic is really amping up at that interchange. It would only make sense to accommodate future use. Semi transportation utilizing the route has to be way up.
Attached Thumbnails
The Villages Florida: Click image for larger version

Name:	IMG_0401.jpg
Views:	362
Size:	72.0 KB
ID:	104238  
__________________
Everywhere

.. though we cannot, while we feel deeply, reason shrewdly, yet I doubt if, except when we feel deeply, we can ever comprehend fully."—Ruskin

Borta bra men hemma bäst

Last edited by Normal; 05-24-2024 at 07:25 AM.
  #19  
Old 05-24-2024, 08:56 AM
J-E-T-S ! J-E-T-S ! is offline
Junior Member
Join Date: Jul 2023
Posts: 2
Thanks: 8
Thanked 2 Times in 1 Post
Default

Quote:
Originally Posted by Shipping up to Boston View Post
That's quite a take....something tells me you might have some sources
I was told over a year ago when I first started looking to buy by my realtor that after Dabney the next 2 villages would be Moultry Creek and Well Point. And that construction would meet in Eastport at the end. Nothing appears to be incorrect in what she said back then.
  #20  
Old 05-24-2024, 09:07 AM
Shipping up to Boston Shipping up to Boston is offline
Platinum member
Join Date: Feb 2024
Location: South Harmon Institute of Technology
Posts: 1,972
Thanks: 2
Thanked 925 Times in 561 Posts
Default

Quote:
Originally Posted by J-E-T-S ! View Post
I was told over a year ago when I first started looking to buy by my realtor that after Dabney the next 2 villages would be Moultry Creek and Well Point. And that construction would meet in Eastport at the end. Nothing appears to be incorrect in what she said back then.
For sure. There's definitely a master plan...and it's expanding
  #21  
Old 05-24-2024, 09:47 AM
Altavia Altavia is offline
Sage
Join Date: Jun 2019
Posts: 4,606
Thanks: 1,938
Thanked 3,538 Times in 1,697 Posts
Default

Quote:
Originally Posted by Normal View Post
They don’t have to drop the bridge at Warm Springs? It already seems wide enough?

We will probably see the clover leaf design at 470? Traffic is really amping up at that interchange. It would only make sense to accommodate future use. Semi transportation utilizing the route has to be way up.
It looks like this from the Turnpike.

Appears the sides will need 40+ feet on each side including the shoulders.
Attached Thumbnails
The Villages Florida: Click image for larger version

Name:	IMG_7899.jpg
Views:	362
Size:	38.1 KB
ID:	104244   The Villages Florida: Click image for larger version

Name:	IMG_7742.jpg
Views:	346
Size:	30.1 KB
ID:	104245  

Last edited by Altavia; 05-24-2024 at 10:35 AM.
  #22  
Old 05-24-2024, 10:18 AM
Normal's Avatar
Normal Normal is offline
Soaring Eagle member
Join Date: Jun 2021
Location: Earth
Posts: 2,492
Thanks: 5,360
Thanked 1,838 Times in 897 Posts
Default Or

Quote:
Originally Posted by Altavia View Post
It looks like this from the Turnpike.

Appears the siding will need 40+ feet on each side including the shoulders.
Or they could just reduce the median.
__________________
Everywhere

.. though we cannot, while we feel deeply, reason shrewdly, yet I doubt if, except when we feel deeply, we can ever comprehend fully."—Ruskin

Borta bra men hemma bäst
  #23  
Old 05-24-2024, 12:18 PM
Altavia Altavia is offline
Sage
Join Date: Jun 2019
Posts: 4,606
Thanks: 1,938
Thanked 3,538 Times in 1,697 Posts
Default

Quote:
Originally Posted by Normal View Post
Or they could just reduce the median.
Does it look like enough room between the posts to you?
Attached Thumbnails
The Villages Florida: Click image for larger version

Name:	IMG_7900.jpg
Views:	323
Size:	43.8 KB
ID:	104246  

Last edited by Altavia; 05-24-2024 at 12:35 PM.
  #24  
Old 05-24-2024, 12:29 PM
Shipping up to Boston Shipping up to Boston is offline
Platinum member
Join Date: Feb 2024
Location: South Harmon Institute of Technology
Posts: 1,972
Thanks: 2
Thanked 925 Times in 561 Posts
Default

Quote:
Originally Posted by Altavia View Post
Does it look like enough room between the story posts to you?
Maybe....for a monorail!
  #25  
Old 05-24-2024, 12:30 PM
Normal's Avatar
Normal Normal is offline
Soaring Eagle member
Join Date: Jun 2021
Location: Earth
Posts: 2,492
Thanks: 5,360
Thanked 1,838 Times in 897 Posts
Default Piles

Quote:
Originally Posted by Altavia View Post
Does it look like enough room between the story posts to you?
Sure, the piles could be an issue
__________________
Everywhere

.. though we cannot, while we feel deeply, reason shrewdly, yet I doubt if, except when we feel deeply, we can ever comprehend fully."—Ruskin

Borta bra men hemma bäst
  #26  
Old 07-10-2024, 09:31 AM
Maker Maker is offline
Veteran member
Join Date: Jul 2022
Posts: 638
Thanks: 13
Thanked 567 Times in 251 Posts
Default

Quote:
Originally Posted by Maker View Post
So what if developer has had some information (for many months) that points to a long term closure of that tunnel?
Recognizing the need for golf cart connectivity between everything being built south, to Brownwood, stores, gasoline, etc,... he shifted focus upon getting Wellpoint done asap so he can open Corbin and McNeil.
Looks like the dots connected, and finally made it to a public press release.
Just announced closing of tunnel for soil repair. No mention of that nasty "S" word (yet).
  #27  
Old 07-10-2024, 09:39 AM
LeRoySmith LeRoySmith is offline
Veteran member
Join Date: Oct 2023
Location: Lake Denham
Posts: 861
Thanks: 145
Thanked 720 Times in 324 Posts
Default

Quote:
Originally Posted by Maker View Post
Looks like the dots connected, and finally made it to a public press release.
Just announced closing of tunnel for soil repair. No mention of that nasty "S" word (yet).
I've made that trip from sawgrass to everglade a few times using that route, it's a nice drive.
__________________
I've got a pool. I've got a pond. Pond's good for you...
  #28  
Old 07-10-2024, 10:10 AM
ElDiabloJoe ElDiabloJoe is offline
Platinum member
Join Date: Aug 2021
Posts: 1,536
Thanks: 104
Thanked 1,729 Times in 655 Posts
Default

Since they're redesigning an entire exit/entrance interchange, this is usually a good time to call up Buc-ee's to see if they'll put in another mega-store with exit lanes feeding right into their property, as has happened in other areas.

*Puts on helmet and shield to fend off incoming lobs from anti-Buc-ee's folks and their missives.*
__________________
Chino 1960's to 1976, Torrance, CA 1976-1983, 87-91, 94-98 / Frederick Co., MD 1983-1987/ Valencia, CA 1991-1994/ Brea, CA 1998-2002/ Dana Point, CA 2002-2019/ Knoxville, TN 2019-Current/ FL 2022-Current
  #29  
Old 07-10-2024, 10:26 AM
LeRoySmith LeRoySmith is offline
Veteran member
Join Date: Oct 2023
Location: Lake Denham
Posts: 861
Thanks: 145
Thanked 720 Times in 324 Posts
Default

Quote:
Originally Posted by ElDiabloJoe View Post
Since they're redesigning an entire exit/entrance interchange, this is usually a good time to call up Buc-ee's to see if they'll put in another mega-store with exit lanes feeding right into their property, as has happened in other areas.

*Puts on helmet and shield to fend off incoming lobs from anti-Buc-ee's folks and their missives.*
Buc-ees sells a plastic batting helmet with their logo, just sayin
__________________
I've got a pool. I've got a pond. Pond's good for you...
  #30  
Old 07-10-2024, 10:37 AM
Shipping up to Boston Shipping up to Boston is offline
Platinum member
Join Date: Feb 2024
Location: South Harmon Institute of Technology
Posts: 1,972
Thanks: 2
Thanked 925 Times in 561 Posts
Default

Quote:
Originally Posted by ElDiabloJoe View Post
Since they're redesigning an entire exit/entrance interchange, this is usually a good time to call up Buc-ee's to see if they'll put in another mega-store with exit lanes feeding right into their property, as has happened in other areas.

*Puts on helmet and shield to fend off incoming lobs from anti-Buc-ee's folks and their missives.*
Not from this guy....Buc-ee’s would be a slam dunk. You want good, responsible commerce....that outfit is 1st class
Closed Thread

Tags
construction, update, village, point, things


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 04:20 AM.