Trump ripped off Architect Andrew Tesoro Trump ripped off Architect Andrew Tesoro - Talk of The Villages Florida

Trump ripped off Architect Andrew Tesoro

 
Thread Tools
  #1  
Old 09-30-2016, 11:39 AM
Guest
n/a
 
Posts: n/a
Default Trump ripped off Architect Andrew Tesoro

Trump cheated this guy four of thousands
“I resent that he shorted me a huge amount of money, his organization does that to everybody. At the time I could see that the carpenters, the tile guy, the landscape consultant, the mechanical engineering consultant, other vendors and tradespeople were all subjected to an after-the-fact renegotiation challenge”
  #2  
Old 09-30-2016, 11:51 AM
Guest
n/a
 
Posts: n/a
Default

Are you going to retread this one again? You started this one weeks ago and it finally petered out. Why not put this one to bed where it belongs?
  #3  
Old 09-30-2016, 11:57 AM
Guest
n/a
 
Posts: n/a
Default

Quote:
Originally Posted by Guest View Post
Trump cheated this guy four of thousands
“I resent that he shorted me a huge amount of money, his organization does that to everybody. At the time I could see that the carpenters, the tile guy, the landscape consultant, the mechanical engineering consultant, other vendors and tradespeople were all subjected to an after-the-fact renegotiation challenge”
And yet in spite of this accusation, Donald Trump has no trouble finding workers to design and build his buildings, does he?
  #4  
Old 10-01-2016, 08:43 AM
Guest
n/a
 
Posts: n/a
Default

Quote:
Originally Posted by Guest View Post
Trump cheated this guy four of thousands
“I resent that he shorted me a huge amount of money, his organization does that to everybody. At the time I could see that the carpenters, the tile guy, the landscape consultant, the mechanical engineering consultant, other vendors and tradespeople were all subjected to an after-the-fact renegotiation challenge”
Not sure what "four of thousands" means, guessing it should be "for thousands".

Obviously you are young (basing that assumption on your immature numerous threads that you have started all with very similar content) and you obviously have not worked in construction.

It is very common for negotiated contract amounts to be adjusted by changes in scope of work during construction. Change orders are issued when materials and / or labor is added or deleted. Back charges are assessed for failure to perform and / or work was not completed on schedule.

There are many scenarios in which an architect could be paid less. The owner has a budget, the general contractor (manages the entire project) has a contract with the owner to build for x amount of money. The architect usually is paid a percentage of the negotiated price between the GC and owner. That fee can be reduced by deleting or reducing scope of work. An example: architect drew 12" poured beams for lintels and the GC had money for 12" poured beams in his price, but the concrete contractor informed them (after the GC contract was written) that 8" poured beams would be sufficient and would result in a reduction of price. This reduction in cost affects the architects fee (as he was working on a percentage of the project total cost). Another reason an architect could be paid less is if he made a mistake that added cost to the project (such as, he drew 12" lintels and they need to be 16").

It appears you are voting for Hillary, and you do not like Trump. Your numerous thread barrage is annoying at best, enjoy your childish ways while you are still young. Eventually you will have to grow up and a lot of the things that seemed so fun, will no longer be.
  #5  
Old 10-01-2016, 08:47 AM
Guest
n/a
 
Posts: n/a
Default

BS distraction thread
 

Tags
consultant, guy, trump, tile, landscape


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 11:10 PM.