Architectural Review Process Architectural Review Process - Page 2 - Talk of The Villages Florida

Architectural Review Process

Closed Thread
Thread Tools
  #16  
Old 01-01-2014, 06:30 PM
cherman338 cherman338 is offline
Member
Join Date: May 2008
Location: Largo
Posts: 45
Thanks: 1
Thanked 0 Times in 0 Posts
Default

I will play by the rules and try to resubmit. The contractor is reputable and will not do the work without the approval. Will post pictures if and when this ever gets done
  #17  
Old 01-03-2014, 12:23 AM
cherman338 cherman338 is offline
Member
Join Date: May 2008
Location: Largo
Posts: 45
Thanks: 1
Thanked 0 Times in 0 Posts
Default

So the end of the story got written today. Went to the ARC Office and showed a picture of what I proposed and they immediately approved it. The contractor just did not explain what I was going to do properly. ARC assumed I was putting just grass to have someplace for my dogs (which I do not own) to run around. I promised them that as the coi died I would dispose of them properly before they started to smell.
  #18  
Old 01-03-2014, 09:13 AM
Bogie Shooter Bogie Shooter is offline
Sage
Join Date: Sep 2008
Posts: 19,746
Thanks: 13
Thanked 6,116 Times in 2,715 Posts
Default

ARC not really the bad guys as some portrayed. Good for OP!
__________________
The further a society drifts from truth the more it will hate those who speak it. George Orwell.
“Only truth and transparency can guarantee freedom”, John McCain
  #19  
Old 01-03-2014, 09:32 AM
sailor47 sailor47 is offline
Senior Member
Join Date: Jun 2011
Posts: 164
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by Bogie Shooter View Post
ARC not really the bad guys as some portrayed. Good for OP!
I agree. It is good for us all if plans are reviewed.

I didn't want to sound negative toward ARC but as it turned out fighting for the OP's plan was the thing to do. ARC has a lot on their plate so somethings get and need a second look. Happy for the out come the plan for the bird cage sounds very good to me.

I call that type of treatment in the Bird cage as bringing the indoors out and outdoors in.
  #20  
Old 01-03-2014, 10:22 AM
Villages Kahuna's Avatar
Villages Kahuna Villages Kahuna is offline
Sage
Join Date: Jul 2007
Location: Seventeen-year Villager
Posts: 3,892
Thanks: 16
Thanked 1,132 Times in 418 Posts
Default Your Issue May Be Structural

Believe it or not, those birdcages are highly engineered to resist wind damage. The screens will blow out first, long before the metal structure fails--at well over 100 mph winds. But their engineering requires very precise construction of the metal pieces and particularly fastening to the concrete pad and turnbuckles placed at precise places. By trying to build the birdcage over dirt, you may be substantially weakening the entire structure because it would not be fastened to the concrete pad.

That may be a possibility.

By the way, I don't think residents have anything to do with approvals of ARC requests. They are handled by full-time professionals and are based on the authority you agreed to in the deed of the residence you purchased.
__________________
Politicians are like diapers--they should be changed frequently, and for the same reason.
  #21  
Old 01-03-2014, 10:32 AM
rubicon rubicon is offline
Email Reported As Spam
Join Date: Nov 2010
Posts: 13,694
Thanks: 0
Thanked 15 Times in 13 Posts
Default

Spot on VK. A committee that holds applicants to their demands will do great harm to this community
  #22  
Old 01-03-2014, 11:02 AM
Bogie Shooter Bogie Shooter is offline
Sage
Join Date: Sep 2008
Posts: 19,746
Thanks: 13
Thanked 6,116 Times in 2,715 Posts
Default

[QUOTE=


[B]By the way, I don't think residents have anything to do with approvals of ARC requests. They are handled by full-time professionals and are based on the authority you agreed to in the deed of the residence you purchased.[/[/B]QUOTE]
__________________________________________
I seemed to recall that the ARC was staffed by residents, so I sent an email to Community Standards; this is the response I received back;

Thank you for your e-mail regarding the members of the Architectural Review Committee (ARC). The ARC primary and alternate members are all residents, they represent the specific area in which they reside and are appointed by their respective Board of Supervisors. When there is an opening on the ARC, a notice is placed on the website and in the local newspaper requesting interested parties apply for the position. Once we have received the applications, the respective Board of Supervisors interviews the candidates, makes a determination and appoints the candidate to the ARC. .
__________________
The further a society drifts from truth the more it will hate those who speak it. George Orwell.
“Only truth and transparency can guarantee freedom”, John McCain

Last edited by Bogie Shooter; 01-03-2014 at 11:39 AM. Reason: New information
  #23  
Old 01-03-2014, 12:33 PM
batman911's Avatar
batman911 batman911 is offline
Gold member
Join Date: Sep 2008
Location: The Villages, FL
Posts: 1,336
Thanks: 0
Thanked 2 Times in 1 Post
Default

I have a small garden in my bird cage which was installed during construction of the home. T&D had to get approval for the garden and the size was limited to less than I originally requested.
  #24  
Old 01-03-2014, 03:00 PM
downeaster downeaster is offline
Platinum member
Join Date: Jun 2008
Posts: 1,562
Thanks: 0
Thanked 8 Times in 5 Posts
Default

Quote:
Originally Posted by rubicon View Post
I would hope for the sake of the future of The Villages that committees such ARC hold tight on covenants rules etc and that especially applies to the rules concerning renting. If you disagree ride around to other housing developments to see what happens when rules are not enforce
I agree.
  #25  
Old 01-12-2014, 07:04 PM
cherman338 cherman338 is offline
Member
Join Date: May 2008
Location: Largo
Posts: 45
Thanks: 1
Thanked 0 Times in 0 Posts
Default

Birdcage will be attached to concrete footing all around but no slab inside. All's well though. They were very polite and accommodating once they heard the plan from the horses mouth.
Closed Thread


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 11:30 AM.