We definitely need them and those that are knowledgeable will tell you that future centers will have closed water systems and will produce their own electricity or will pay to upgrade local electric production at not cost and most likely a lower cost for residents in the area. I would rather have a data center than a sewage disposal plant or garbage land fill as a neighbor.
Water and electric are concerns. Closed loop water does not mean no water usage, evaporation is excessive. Providing their own electric means NGas, diesel, propane, etc to generate power.

I urge anyone on the fence to google 'data center noise'. These monster buildings generate a high pitch drone constantly. Add to that monthly or weekly generator tests for their back-up power on multiple generators. To quote one resident "I loved it here then they built this (data center) and now the noise is driving us crazy. Even with the windows closed and curtains drawn we hear that buzz 24/7/365. I bought my townhouse for $380K 4 years ago and now they are selling used for $220K if someone ignores the noise. I can't wait to get out of here."