Talk of The Villages Florida - Rentals, Entertainment & More
Talk of The Villages Florida - Rentals, Entertainment & More
|
#166
|
||
|
||
|
Quote:
More to the big points: 1. Utility demands such as power and water makeup can occur at a remote site not in Sumter County. Power Gereation can be elsewhere and power deliverred to new Dta Center. 2. The new Data center designs are very different than the older smaller Centers as pointed out in earlier posts. 3. I tried to get typical cooling water supply and return temps but there are no consistent designs. The electronic equipment has varying needs. It far beyond my comprehension level to try some categorization. Some Basic Principles for consideration. 1. Closed loop does not mean self contained. If the heat removed from the electronics and transferred to the cooling loop liquids, does not get rejected, the data Center will Not function. I believe OBB agrees with this statement. 2. Recirculating Cooling Water system cooled over a cooling tower, my example, and OBB hybrid system are essentially the same in principle. This is the cheapest equipment cost but requires a lot of water 3. The recirclated water in the closed loop is highly treated with chemicals to avoid fouling and corrosion. The liquid has a lot of glychol which means it can be used for low temps below 32F if desirable for the electronics. 4 Using outside chillers saves water at the plant , but this additional power requires water at the power generation site.requires more equipment, and power consumption. It generally more expensive. Now for numbers to be used for understanding the size of the impacts for a 1GW Dtat Center. a. Power Generation Modern Plant Combined Cycle 1.64 GW (2 at .82GW) cost 1.3 Billion$ in 2019 Crystal River Station. b. Power Station combined cycle efficiency is about 55 to 60% but there are distribution losses. So need to buy about 2GW worth of NG rough number c. Power delivered to Data Center is mostly turned into waste heat that must be removed. So need to extract and dispose of 1GW heat from the recirc water. b. Power sent to Data Center eventually needs to be removed from the recirculating water. Water is enclosed, heat is NOT. So my bottom line is that a 1GW Data Center is a big impact some at site and other impacts at power gen and water supply. There are a number of vendor/designers for these cooling systems with various schemes to reduce cost. But the Devil is in the details. I am signing out.: |
|
|
| Reply |
|
|
|