#16
|
||
|
||
|
Quote:
Closed loop water systems and nuclear can help with other issues. |
|
|
|
#17
|
||
|
||
|
Quote:
Closed-loop water systems will cut back on water usage but the mechanical systems needed to cool the water before it is recirculated will create some of the objectionable noise.
__________________
Why do people insist on making claims without looking them up first, do they really think no one will check? Proof by emphatic assertion rarely works. Confirmation bias is real; I can find any number of articles that say so. Victor, NY - Randallstown, MD - Yakima, WA - Stevensville, MD - Village of Hillsborough |
|
#18
|
||
|
||
|
There's a limit to how far "underground" anything can be built in Florida. Much of it is at or near sea-level, and built on sand, clay, and limestone (which is why Florida is the sinkhole capital of the country).
|
|
#19
|
||
|
||
|
Quote:
Underground —> expensive and risky. Look for data centers in space in the foreseeable future. Last edited by spinner1001; Today at 11:48 AM. Reason: spelling |
|
#20
|
||
|
||
|
How many hundreds of thousands of people live near airports, railroads, fire stations, etc.? people have chosen to live near noise forever, and they will continue to live near data centers old or new. I could not imagine living in a city like New York having to listen to traffic and sirens all day and into the night, I can imagine living out in the country and listening to the more even sounds of a data center, it's something that I feel anyone can get used to rather quickly.
|
|
#21
|
||
|
||
|
Quote:
__________________
Everywhere “Better by far you should forget and smile Than that you should remember and be sad.” Christina Rossetti Borta bra men hemma bäst Ћє βÌŦÐÍÐ₤Ξ® Last edited by Normal; Today at 12:36 PM. |
|
#22
|
||
|
||
|
Quote:
|
|
#23
|
||
|
||
|
What we do know is Juniper Creek will be its water supply and it will all be powered by natural gas coming from the main Florida Pipeline. What we also know is it will be adjacent to the town of Center Hill in Sumter County Florida.
__________________
Everywhere “Better by far you should forget and smile Than that you should remember and be sad.” Christina Rossetti Borta bra men hemma bäst Ћє βÌŦÐÍÐ₤Ξ® |
|
#24
|
||
|
||
|
So it's not going to be a noise issue for any current Villages resident. And by the time the developer gets that far south, people will make the decision to buy or not, just like they did with the turnpike noise.
|
|
#25
|
||
|
||
|
Quote:
Just another thing to create more divisiveness.... |
|
#27
|
||
|
||
|
Quote:
NG fired Power generation using combined cycle technology (Gas Turbine, Waste Heat Power generation and Steam turbines0 are about 55 to 60% efficient. I will use 50% for convenience. 1 GW power Generation requires 2 GW fuel and needs to reject 1 gw waste heat to the atmosphere. Power Generation and heat rejection MUST be located outside. GT exhaust goes to a stack to atmosphere and the inside closed loop water must be sent to heat rejection equipment such as cooling tower. The cooling tower fans blow outside air across the former closed loop water whih cascades down splash devices to cool the loop water for recycle to the data center and the power generation turbines to condense steam exhaust to recover the condensate for Boiler Feedwater. In the Cooling Tower much of the cooling is done by evaporating warm recirculating water. None of this can be located underground. \ Now for some numbers:from AI a. 1 GW heat rejection requires 15 to 20,000 gal per minute recirculaing water. b. Water lost in the Cooling Tower must be made up with suitable quality water NOT Irrigation water without extenesive treatment.. c.Make up water for a power plant is about 180 gal per mwh x 1000 mw means MU =~ 3,000 gpm or 4,320,000 gal per day. Hopefully, the local regulaters will ensure that the Data Center Developers ensure that Data Center will provide all Electric Power and all water required plus the Impact Costs are fully covered. In addition all roads etc. are covered by the Data Center Developers. Another key comparison is how big are the new data centers compared to the Jupiter Creek and Sumter proposal. A site visit would be in order if any large data centers are located nearby based on past experience. |
|
#28
|
||
|
||
|
Quote:
Those that are "knowledgeable" will tell you building new data centers can have a huge negative impact on the local residents. Hucksters will promise you the moon to get what they want. Delivering on their promise is another story. The industry has an abysmal record on that. |
|
#29
|
||
|
||
|
It is not unanimous among knowledgeable people. Doomers are going to doom. The positive part is the locals who are affected — positively and negatively — get a say.
|
| Reply |
|
|
|