Upgrades to new Patio Villa Upgrades to new Patio Villa - Page 2 - Talk of The Villages Florida

Upgrades to new Patio Villa

Closed Thread
Thread Tools
  #16  
Old 02-21-2023, 09:17 AM
ron32162 ron32162 is offline
Senior Member
Join Date: Oct 2015
Posts: 197
Thanks: 269
Thanked 85 Times in 60 Posts
Default

I don't think pavers are allowed in driveways of courtyard villas and patio villas
  #17  
Old 02-21-2023, 09:25 AM
Michael 61 Michael 61 is offline
Gold member
Join Date: Jul 2022
Posts: 1,197
Thanks: 1,194
Thanked 2,351 Times in 649 Posts
Default

Quote:
Originally Posted by VApeople View Post
Wow, is that ever great advice!
Yes - that is where to start first - thank you
__________________
MICHAEL
*The Village of Richmond*
  #18  
Old 02-21-2023, 02:24 PM
joelfmi joelfmi is offline
Senior Member
Join Date: Sep 2020
Location: Long Island NY
Posts: 485
Thanks: 9
Thanked 193 Times in 116 Posts
Send a message via AIM to joelfmi
Default

Are you setting down these upgrades will cost you about approximate 200K will you get It back when you sell, I don't think so?
  #19  
Old 02-21-2023, 04:48 PM
thelegges's Avatar
thelegges thelegges is offline
Sage
Join Date: May 2010
Location: Drayton Plains, MI, Vietnam, Waterford, MI, Pennacamp, Fernandina, Duval, 1 retired in Richmond
Posts: 2,698
Thanks: 17
Thanked 1,938 Times in 766 Posts
Default

Quote:
Originally Posted by joelfmi View Post
Are you setting down these upgrades will cost you about approximate 200K will you get It back when you sell, I don't think so?
$200k really, putting in a 28x14 pool plus 12x12 and 12x18 concrete and bird cage for less than $100,000
  #20  
Old 02-21-2023, 05:45 PM
Michael 61 Michael 61 is offline
Gold member
Join Date: Jul 2022
Posts: 1,197
Thanks: 1,194
Thanked 2,351 Times in 649 Posts
Default

Agree, Joel is way off base.
__________________
MICHAEL
*The Village of Richmond*
  #21  
Old 02-21-2023, 10:03 PM
rogerk rogerk is offline
Senior Member
Join Date: Sep 2010
Posts: 377
Thanks: 108
Thanked 117 Times in 80 Posts
Default

Quote:
Originally Posted by villagetinker View Post
Do NOT rely on contractors to get ARC approval, get it yourself. As for your projects, the irrigation will need to be done in conjunction with the exterior expansion projects. This should be handled by the main contractor, and if you plan on landscaping in this area make sure you know where the new pipes are located so you do not hit these when the new plants are installed. IMHO, I would stay away from pavers, search this site, typically lots of maintenance and cracking problems. I would go with concrete stain, HOWEVER, as I understand it there are restrictions on this in villas. As noted above look at your deed restriction very carefully before you proceed. Make sure you understand the restrictions shown on your plot plan, and consider the potential impact on your neighbor.
Good luck with your projects.
Agree 110%
  #22  
Old 02-21-2023, 10:24 PM
Calisport Calisport is offline
Senior Member
Join Date: May 2021
Posts: 403
Thanks: 106
Thanked 214 Times in 125 Posts
Default

I've done all except driveway and raise concrete level. Took about a year. Do one at a time. Pay a contractor to schedule your birdcage first. That may take some time since they are all busy. Epoxy last due to traffic in and out. See if you can just have a few sprinklers capped otherwise rerouting can cost thousands.
  #23  
Old 02-21-2023, 11:21 PM
nob77@comcast.net's Avatar
nob77@comcast.net nob77@comcast.net is offline
Member
Join Date: Jun 2020
Location: Valle verde
Posts: 47
Thanks: 163
Thanked 23 Times in 15 Posts
Default Good luck!

Quote:
Originally Posted by Michael 61 View Post
It’s time for me to begin upgrading my new patio villa. I need some direction in which sequential order to complete each project. Here’s what I plan to do:

1) Install gutters
2) Extend concrete on side of house
3) Build birdcage to side on house
4) Re-route sprinkler lines to accommodate extension of concrete / birdcage
5) Landscape side and front of house, including building small retention wall for plants/palms
6) Putting in pavers in driveway
7) Apoxy both interior garage as well as lanai/birdcage
8) Upgrade front door (glass inserts)
9) ** Maybe raise flooring height in lanai, to make even with interior of house**

I will be working with multiple contractors, so need advice where to start first.

Thanks as usual for any help provided.
Good luck. Take your time.
  #24  
Old 02-22-2023, 02:18 AM
Garywt Garywt is offline
Soaring Eagle member
Join Date: Apr 2016
Posts: 2,013
Thanks: 4
Thanked 2,003 Times in 721 Posts
Default

For 1-8 I can’t imagine it would be more than $50k. Of course that depends on how much landscaping and how big the patio will be.
  #25  
Old 02-22-2023, 02:17 PM
villagetinker's Avatar
villagetinker villagetinker is offline
Sage
Join Date: Sep 2013
Location: Village of Pinellas
Posts: 11,091
Thanks: 3
Thanked 8,218 Times in 2,984 Posts
Default

Quote:
Originally Posted by Calisport View Post
I've done all except driveway and raise concrete level. Took about a year. Do one at a time. Pay a contractor to schedule your birdcage first. That may take some time since they are all busy. Epoxy last due to traffic in and out. See if you can just have a few sprinklers capped otherwise rerouting can cost thousands.
You are not allowed to have live water lines under concrete pads, the irrigation lines will need to be moved. We had 4 lines moved, cost was a few hundred dollars., and included in the cost of the pad.
__________________
Pennsylvania, for 60+ years, most recently, Allentown, now TV.
  #26  
Old 03-11-2023, 11:48 AM
GKarl GKarl is offline
Junior Member
Join Date: Mar 2022
Posts: 3
Thanks: 1
Thanked 1 Time in 1 Post
Default

The Birdcage will be installed with gutters to attach it to the house. Do the gutters after the birdcage.
  #27  
Old 03-11-2023, 12:25 PM
Pairadocs Pairadocs is offline
Soaring Eagle member
Join Date: Oct 2020
Location: Here, there, a lot of time in the Caribbean and keys, not much time spent in cold climates
Posts: 2,317
Thanks: 1,777
Thanked 2,078 Times in 893 Posts
Default

Quote:
Originally Posted by Michael 61 View Post
It’s time for me to begin upgrading my new patio villa. I need some direction in which sequential order to complete each project. Here’s what I plan to do:

1) Install gutters
2) Extend concrete on side of house
3) Build birdcage to side on house
4) Re-route sprinkler lines to accommodate extension of concrete / birdcage
5) Landscape side and front of house, including building small retention wall for plants/palms
6) Putting in pavers in driveway
7) Apoxy both interior garage as well as lanai/birdcage
8) Upgrade front door (glass inserts)
9) ** Maybe raise flooring height in lanai, to make even with interior of house**

I will be working with multiple contractors, so need advice where to start first.

Thanks as usual for any help provided.
Those who have done all on your list can give you great tips, but, I don't think anyone but YOU can make the sequential list, just impossible to say if more natural light (important to me) coming through new glass door insets, or a nice design finish on a lanai floor, is the priority. It's all so individual, we rushed guttering, then found it was probably not a priority in this part of the country, but we got it, and that's fine. Biggest regret is the pavers, gives a fantastic look. But "most" used here are very different than when you see this done at a house in an upscale neighborhood in a northern state. The thin, porous, types used here, to make them MUCH more "affordable", crack easily, need expensive maintenance and the price goes up every year for "re-sealing", as does the material if you do your own. We wish we'd never done pavers for walks and drive. And now that we know more about a lot of things, would not have done a painted drive either. Wish we had just a plain, concrete drive ! But.... MANY love the look, don't mind the on going expense, or the replacement of cracked ones, so no one can tell YOU what would mean the most to YOU. As others have so wisely commented, whatever you decide, DO NOT FAIL to get that ARC approval, legions of true stories about what that can cost ! It only take ONE curious person in your neighborhood to find out if you are 100% in compliance. Now, I'm sure you've seen the growing controversy over people who have UNKNOWINGLY purchased an out of compliance property (wrong percentage of sod vrs. stone, rock, and so on). Seems the R.E. agents do not check all that out when you call one to list your house for sale, and you may not even know, and an unsuspecting buyer does not find out until just one neighbor becomes curious about who is, and who possibly is not, in compliance ! Slippery slope, beware !
  #28  
Old 03-11-2023, 12:33 PM
Pairadocs Pairadocs is offline
Soaring Eagle member
Join Date: Oct 2020
Location: Here, there, a lot of time in the Caribbean and keys, not much time spent in cold climates
Posts: 2,317
Thanks: 1,777
Thanked 2,078 Times in 893 Posts
Default

Quote:
Originally Posted by JMintzer View Post
I'd start with "Let's just live in the house for a while and see what we -really- want to do"...
THE BEST SUGGESTION on this thread ! But, perhaps you have been in your new home at least six months (?) Personally I think it takes at least that long to really analyze your day to day routine, how you do things daily in your new home, etc. If 24 months, IMO, not enough time to really know what will mean the most to you, and, what is "worth" the cost !~ We don't have any, but, being in the homes of many friends for years now, I'd say sky light tubes would be something we would have invested in ! LOVE natural light in kitchens and baths, that would be worth a lot to me.
  #29  
Old 03-11-2023, 12:48 PM
JMintzer's Avatar
JMintzer JMintzer is offline
Sage
Join Date: Feb 2021
Location: Where Eagles Dare to Soar...
Posts: 11,958
Thanks: 486
Thanked 8,980 Times in 4,717 Posts
Default

Quote:
Originally Posted by Pairadocs View Post
THE BEST SUGGESTION on this thread ! But, perhaps you have been in your new home at least six months (?) Personally I think it takes at least that long to really analyze your day to day routine, how you do things daily in your new home, etc. If 24 months, IMO, not enough time to really know what will mean the most to you, and, what is "worth" the cost !~ We don't have any, but, being in the homes of many friends for years now, I'd say sky light tubes would be something we would have invested in ! LOVE natural light in kitchens and baths, that would be worth a lot to me.
It's been barely 2 months... That's why I recommended he wait a while before going hog wild on the upgrades...

Yes, I know a ne home is exciting and you want to do everything, all at once. But take a beat...Catch your breath and the figure out what you REALLY want/need...

We've been in our home 2 years and we're STILL deciding on some upgrades...
__________________
Most things I worry about
Never happen anyway...

-Tom Petty
Closed Thread

Tags
side, house, birdcage, concrete, interior


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 03:41 AM.