441 southbound a mess

Closed Thread
Thread Tools
  #1  
Old 04-21-2021, 11:08 AM
Bjeanj Bjeanj is offline
Soaring Eagle member
Join Date: Jan 2015
Location: Santiago
Posts: 2,127
Thanks: 113
Thanked 1,478 Times in 549 Posts
Default 441 southbound a mess

441 southbound is down to one lane by Rolling Acres. If you have to go that way, I recommend you go a different route.
__________________
Teach your daughter how to shoot, because a restraining order is just a piece of paper.
  #2  
Old 04-21-2021, 11:49 AM
Stu from NYC Stu from NYC is offline
Sage
Join Date: Feb 2020
Posts: 12,582
Thanks: 1,166
Thanked 14,052 Times in 5,337 Posts
Default

Wonder how long before this construction is completed?
  #3  
Old 04-21-2021, 11:58 AM
drcar drcar is offline
Senior Member
Join Date: Apr 2012
Posts: 476
Thanks: 88
Thanked 330 Times in 129 Posts
Default

Quote:
Originally Posted by Stu from NYC View Post
Wonder how long before this construction is completed?
lol, til is done
  #4  
Old 04-21-2021, 02:18 PM
Carla B Carla B is offline
Sage
Join Date: Mar 2008
Posts: 2,777
Thanks: 52
Thanked 703 Times in 377 Posts
Default

They (the government, I suppose) are certainly never happy with 441. They were working on it when we moved here and now they are working on it again. Are they still planning to tear down the overpass over Hwy. 25 and replace that with a regular intersection?
  #5  
Old 04-21-2021, 02:25 PM
Bjeanj Bjeanj is offline
Soaring Eagle member
Join Date: Jan 2015
Location: Santiago
Posts: 2,127
Thanks: 113
Thanked 1,478 Times in 549 Posts
Default

🤷
Who knows?
__________________
Teach your daughter how to shoot, because a restraining order is just a piece of paper.
  #6  
Old 04-21-2021, 02:25 PM
Bjeanj Bjeanj is offline
Soaring Eagle member
Join Date: Jan 2015
Location: Santiago
Posts: 2,127
Thanks: 113
Thanked 1,478 Times in 549 Posts
Default

🤷*♀️
Who knows?
__________________
Teach your daughter how to shoot, because a restraining order is just a piece of paper.
  #7  
Old 04-21-2021, 03:21 PM
golfing eagles's Avatar
golfing eagles golfing eagles is offline
Sage
Join Date: Mar 2015
Location: The Villages
Posts: 12,227
Thanks: 820
Thanked 12,912 Times in 4,141 Posts
Default

Quote:
Originally Posted by drcar View Post
lol, til is done
So many highway dollars, so few highways.....................:1rot fl:

Last edited by golfing eagles; 04-21-2021 at 04:19 PM.
  #8  
Old 04-21-2021, 03:45 PM
Topspinmo's Avatar
Topspinmo Topspinmo is offline
Sage
Join Date: Dec 2012
Location: Somewhere over the rainbow
Posts: 12,416
Thanks: 6,353
Thanked 4,940 Times in 2,460 Posts
Default

Well from previous posts on multi lane highways and byways everybody supposed to drive in right lane anyway unless passing, so what’s the problem O, I see , can’t speed in the left lane all the way.
  #9  
Old 04-21-2021, 05:07 PM
villagetinker's Avatar
villagetinker villagetinker is offline
Sage
Join Date: Sep 2013
Location: Village of Pinellas
Posts: 9,677
Thanks: 2
Thanked 6,157 Times in 2,251 Posts
Default

The current problem is probably due to the reconstruction to remove the overpass over route 25. I have already made plans to avoid this area for several months. Hopefully it will be better with the additional lanes.
__________________
Pennsylvania, for 60+ years, most recently, Allentown, now TV.
  #10  
Old 04-21-2021, 06:09 PM
CFrance's Avatar
CFrance CFrance is offline
Sage
Join Date: Dec 2011
Location: Tamarind Grove/Monpazier, France
Posts: 14,480
Thanks: 388
Thanked 1,922 Times in 783 Posts
Default

We moved here in 2011, and 441 was a construction nightmare for a year or more, maybe two. It took forever.

Then "they" decided to widen 466A from Powel Road to 301, and that-few block construction took two full years.
__________________
It's harder to hate close up.
  #11  
Old 04-21-2021, 06:21 PM
stanley stanley is offline
Veteran member
Join Date: Nov 2020
Location: The here and now
Posts: 753
Thanks: 1,062
Thanked 1,319 Times in 462 Posts
Default

Quote:
Originally Posted by villagetinker View Post
The current problem is probably due to the reconstruction to remove the overpass over route 25. I have already made plans to avoid this area for several months. Hopefully it will be better with the additional lanes.
I really do not think they are getting rid of the overpass...why would they do all the structural reinforcing of that overpass?
  #12  
Old 04-21-2021, 06:23 PM
CFrance's Avatar
CFrance CFrance is offline
Sage
Join Date: Dec 2011
Location: Tamarind Grove/Monpazier, France
Posts: 14,480
Thanks: 388
Thanked 1,922 Times in 783 Posts
Default

Quote:
Originally Posted by stanley View Post
I really do not think they are getting rid of the overpass...why would they do all the structural reinforcing of that overpass?
A couple of years ago, they said they were going to get rid of the overpass. Who knows what the current plans are.
__________________
It's harder to hate close up.
  #13  
Old 04-21-2021, 06:24 PM
OrangeBlossomBaby OrangeBlossomBaby is offline
Sage
Join Date: Feb 2015
Posts: 8,538
Thanks: 6,878
Thanked 9,523 Times in 3,109 Posts
Default

Quote:
Originally Posted by CFrance View Post
We moved here in 2011, and 441 was a construction nightmare for a year or more, maybe two. It took forever.

Then "they" decided to widen 466A from Powel Road to 301, and that-few block construction took two full years.
Well that's what happens when you have a place as busy and successful as the Villages, which is showing no signs of slowing down new development. It attracts more people, which attracts more commerce, which all combines to attract a LOT more traffic, which means roads have to be widened, repaved, repainted/lined, new driveways need to be built out, new water and underground electric cables installed to connect to the new sections, and by the time you're done with all of that, everything you did the first time around, needs to be upgraded so you have to start all over again.

If you want this to stop, then you need to convince the Morse Family to either stop or significantly slow down development. They own most of the land now, so no one else will be building on it.
  #14  
Old 04-21-2021, 06:31 PM
CFrance's Avatar
CFrance CFrance is offline
Sage
Join Date: Dec 2011
Location: Tamarind Grove/Monpazier, France
Posts: 14,480
Thanks: 388
Thanked 1,922 Times in 783 Posts
Default

Quote:
Originally Posted by OrangeBlossomBaby View Post
Well that's what happens when you have a place as busy and successful as the Villages, which is showing no signs of slowing down new development. It attracts more people, which attracts more commerce, which all combines to attract a LOT more traffic, which means roads have to be widened, repaved, repainted/lined, new driveways need to be built out, new water and underground electric cables installed to connect to the new sections, and by the time you're done with all of that, everything you did the first time around, needs to be upgraded so you have to start all over again.

If you want this to stop, then you need to convince the Morse Family to either stop or significantly slow down development. They own most of the land now, so no one else will be building on it.
I said nothing about wanting it to stop. I was commenting on how long it takes them to do the construction.
__________________
It's harder to hate close up.
  #15  
Old 04-21-2021, 07:11 PM
villagetinker's Avatar
villagetinker villagetinker is offline
Sage
Join Date: Sep 2013
Location: Village of Pinellas
Posts: 9,677
Thanks: 2
Thanked 6,157 Times in 2,251 Posts
Default

The removal of the overpass has been published several times, along with the new road configuration and the new traffic light. In order to remove the over pass there will need to be temporary travel lanes installed, hence the current mess.
__________________
Pennsylvania, for 60+ years, most recently, Allentown, now TV.
Closed Thread

Tags
southbound, recommend, acres, rolling, lane


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 03:48 AM.