301 Update 301 Update - Page 2 - Talk of The Villages Florida

301 Update

Closed Thread
Thread Tools
  #16  
Old 02-01-2025, 08:30 AM
Switter Switter is offline
Senior Member
Join Date: Jul 2023
Posts: 264
Thanks: 27
Thanked 135 Times in 91 Posts
Default

Quote:
Originally Posted by vintageogauge View Post
I wonder if they are going to have turning lanes on either side for the trucks turning into all of the business along there.
This is my one major complaint about the roads in this area, the lack of right turn lanes.

Especially on 441.

I don't know if that's just a Florida thing...
  #17  
Old 02-01-2025, 09:25 AM
Sgt Ed Sgt Ed is offline
Senior Member
Join Date: May 2019
Posts: 118
Thanks: 14
Thanked 64 Times in 40 Posts
Default

Quote:
Originally Posted by Billy1 View Post
Will the 301 four lane connect directly to the single lane at the turnpike?
I think the FEDERAL DOT wants US 301 to be entirely at least 4 lane.
  #18  
Old 02-01-2025, 01:07 PM
Regorp Regorp is offline
Veteran member
Join Date: Nov 2021
Posts: 513
Thanks: 819
Thanked 280 Times in 183 Posts
Default 301 improvement

Quote:
Originally Posted by Altavia View Post
Project Description:

The Florida Department of Transportation (FDOT) is improving U.S. 301 (State Road
(S.R.) 35) from County Road (C.R.) 470 to Florida's Turnpike in Sumter County.

FDOT plans to widen this portion of U.S. 301 to provide two travel lanes in each direction, separated by a raised median.
The project is divided into three segments:

Segment 1 (FPID 430132-2) from County Road (C.R.) 470 to Industrial Park Drive;

Segment 2 (FPID 430132-4) is a realignment of U.S. 301 from Industrial Park Drive to Warm Springs Avenue; and

Segment 3 (FPID 430132-5) from Warm Springs Avenue to Florida's Turnpike.

In addition to widening, the project includes adding a shared-use path, installing traffic signals at Industrial Park Drive and Warm Springs Avenue, and building a roundabout at Marsh Bend Trail.

Right of way acquisition on the project is underway.

Construction on the first segment (430132-4) is expected to begin in early 2026.
. The addition of a roundabout at Marsh Bend Trail will slow down traffic and cause severe backups due to heavy tractor trailer usage. A study needs to be conducted to investigate this potential problem.
  #19  
Old 02-01-2025, 04:11 PM
Babubhat Babubhat is offline
Platinum member
Join Date: May 2021
Posts: 1,962
Thanks: 307
Thanked 1,760 Times in 792 Posts
Default

What is being done about the horrible backups on 301 south at the turnpike? The BP station left turn bump out only allows a few vehicles to wait for a left turn blocking through traffic to the 44 light
  #20  
Old 02-01-2025, 04:32 PM
vintageogauge vintageogauge is offline
Sage
Join Date: Aug 2016
Location: village of Fenney, Ford City, Pa., and Hudson, Ohio
Posts: 4,671
Thanks: 6
Thanked 4,894 Times in 1,681 Posts
Default

My guess is at least 3 years but most likely more. This has not been very well thought out, all that retail land, 1800 feet of frontage and who knows how many acres of back parcels, on the west side just south of the turnpike is going to cause another major headache once all of that land has been developed into retail stores.
  #21  
Old 02-01-2025, 07:35 PM
Topspinmo's Avatar
Topspinmo Topspinmo is offline
Sage
Join Date: Dec 2012
Location: Somewhere over the rainbow
Posts: 15,303
Thanks: 7,682
Thanked 6,314 Times in 3,267 Posts
Default

Quote:
Originally Posted by villagetinker View Post
Before moving to TV we had the experience of "road improvements" in PA to improve traffic flow, which worked fine for around 2 years by then the traffic had increased to the point it was as bad as before the improvement. Then look at I4 billions spent and almost daily accidents and delays, I suspect the same will be true for 301. It appears road improvements attract additional housing, businesses, etc., which create additional traffic and more congestion.
I hope I am wrong.

I believe you are right, I lived in OKC for 20 years, they never got I-35 or I-40 construction projects done. Buy time the completed section through town it was already outdated. I know guy work road construction and retired doing I-35/I 40 updates in OKC. I went through there in 73 heading for Texas. I move to OKC IN 94 retire in 2014, They was still working on them, finely got rid of raised bridges through downtown after I left.

301 needs to be 4 lanes with turning lanes through Summerfield, it bottom necks down traffic from Ocala and 75 traffic going to and from.
  #22  
Old 02-01-2025, 07:48 PM
Babubhat Babubhat is offline
Platinum member
Join Date: May 2021
Posts: 1,962
Thanks: 307
Thanked 1,760 Times in 792 Posts
Default

Quote:
Originally Posted by FloridaGuy66 View Post
I'm really hoping that Clay Drain road being widened to 2 lanes in each direction is a part of this as I've heard rumored. People need a proper bypass to avoid going through main street in Wildwood once they are north of the turnpike.
Where are the cars going to exit on Clay drain road? Signature drive intersection by Sparr is already a traffic nightmare.
  #23  
Old 02-01-2025, 08:00 PM
FloridaGuy66 FloridaGuy66 is offline
Senior Member
Join Date: Jul 2024
Posts: 259
Thanks: 3
Thanked 269 Times in 116 Posts
Default

Quote:
Originally Posted by Babubhat View Post
Where are the cars going to exit on Clay drain road? Signature drive intersection by Sparr is already a traffic nightmare.
CR 179 which is an unused road that goes between Clay Drain Rd and SR44 with the UF Health Brownwood emergency location to the East of it. It seems that was the long term plan at some point.
  #24  
Old 02-01-2025, 08:00 PM
Pugchief's Avatar
Pugchief Pugchief is offline
Gold member
Join Date: Mar 2023
Posts: 1,134
Thanks: 81
Thanked 1,394 Times in 550 Posts
Default

Quote:
Originally Posted by Babubhat View Post
Where are the cars going to exit on Clay drain road? Signature drive intersection by Sparr is already a traffic nightmare.
Obviously, they would need to widen Signature Rd and CR 179 as well for it to work. Not holding my breath....
  #25  
Old 02-02-2025, 02:55 PM
harby harby is offline
Member
Join Date: Mar 2017
Posts: 43
Thanks: 0
Thanked 9 Times in 8 Posts
Default Widen 301 highway

Great, but widen 4 lane road won t improve if there s no improvement or widen to 4 lane road right under the bridge (FL Turnpike) which really make a terrible barrier. Chas
  #26  
Old 02-02-2025, 03:24 PM
Babubhat Babubhat is offline
Platinum member
Join Date: May 2021
Posts: 1,962
Thanks: 307
Thanked 1,760 Times in 792 Posts
Default

CR 179 has zero additional capacity. They are building on the vacant land across from the ER. The ER had to block access because the road was used as a shortcut to Meggison road south through their property.

The new Chipotle prevents any widening of Signature road.

Last edited by Babubhat; 02-02-2025 at 03:49 PM.
Closed Thread

Tags
project, segment, springs, park, industrial


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 10:20 PM.