1.7 mill maintenance building 1.7 mill maintenance building - Page 2 - Talk of The Villages Florida

1.7 mill maintenance building

Closed Thread
Thread Tools
  #16  
Old 05-27-2024, 09:52 AM
Bill14564 Bill14564 is online now
Sage
Join Date: Nov 2020
Location: Village of Hillsborough
Posts: 7,391
Thanks: 2,287
Thanked 7,728 Times in 3,034 Posts
Default

Quote:
Originally Posted by Papa_lecki View Post
Bill should be able to confirm, but a maintenance building isn’t just a shell to store mowers

Doesn’t it need a place to clean equipment, sharpen blades, change oil, fuel mowers, etc.
How many holes will the facility serve?

This is from a GM job description for a club in the northeast. It’s a premier club, but only 18 holes.
“In April 2012 the Club completed and moved equipment into their new, $3.5M, state of the art, Greens and Grounds Maintenance Facility.”
Likely some of that will be in the cost.

The new facility will serve an older course. Does that mean it is a replacement for an existing facility or did they just realize after all this time that they need a maintenance facility? If it is a replacement then some of the cost might be in the removal of the existing structure.

It is also possible that the District doesn't always get a competitive price. Sure, the best price available from the preferred providers, but the best price overall?

It will be interesting to see the proposal.
__________________
Why do people insist on making claims without looking them up first, do they really think no one will check? Proof by emphatic assertion rarely works.
Confirmation bias is real; I can find any number of articles that say so.


Victor, NY - Randallstown, MD - Yakima, WA - Stevensville, MD - Village of Hillsborough
  #17  
Old 05-27-2024, 10:41 AM
mraines mraines is offline
Senior Member
Join Date: Nov 2013
Posts: 340
Thanks: 634
Thanked 260 Times in 126 Posts
Default

Quote:
Originally Posted by OrangeBlossomBaby View Post
Then THEY can pay for a shelter for THEIR equipment.
Who is this contractor? I've been wondering why we have to pay to shelter his equipment. Why isn't he paying for this?
  #18  
Old 05-27-2024, 10:43 AM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,862
Thanks: 1,013
Thanked 11,056 Times in 4,226 Posts
Default

Quote:
Originally Posted by mraines View Post
Who is this contractor? I've been wondering why we have to pay to shelter his equipment. Why isn't he paying for this?
All other locations have shelters for contractor equipment.

A contractor will not put up a $1mil facility on an annual contract.
__________________
Identifying as Mr. Helpful
  #19  
Old 05-27-2024, 12:02 PM
Maker Maker is offline
Veteran member
Join Date: Jul 2022
Posts: 638
Thanks: 13
Thanked 567 Times in 251 Posts
Default

A few years ago my best friend had a 40x60 metal building put up, with concrete floor, office area, bathroom, lighting, storage, fully insulated with HVAC... for $225k total.

We are getting hosed here.
  #20  
Old 05-27-2024, 12:35 PM
Stu from NYC Stu from NYC is offline
Sage
Join Date: Feb 2020
Posts: 15,303
Thanks: 1,263
Thanked 16,272 Times in 6,378 Posts
Default

Quote:
Originally Posted by Maker View Post
A few years ago my best friend had a 40x60 metal building put up, with concrete floor, office area, bathroom, lighting, storage, fully insulated with HVAC... for $225k total.

We are getting hosed here.
1.7 million seems awfully high. Interested in why so much
  #21  
Old 05-27-2024, 12:51 PM
JMintzer's Avatar
JMintzer JMintzer is offline
Sage
Join Date: Feb 2021
Location: Where Eagles Dare to Soar...
Posts: 11,959
Thanks: 486
Thanked 8,983 Times in 4,719 Posts
Default

Quote:
Originally Posted by Maker View Post
A few years ago my best friend had a 40x60 metal building put up, with concrete floor, office area, bathroom, lighting, storage, fully insulated with HVAC... for $225k total.

We are getting hosed here.
Quote:
Originally Posted by Stu from NYC View Post
1.7 million seems awfully high. Interested in why so much
Because it's most likely not "just" a simple storage shed, with a bathroom and HVAC...

They will have to install fuel tanks (which aren't cheap), upgraded electric, water, fire suppression, and all other things needed to help maintain the vehicles.

If they're installing fuel tanks, that a whole other can-o-worms, with special permits, environmental concerns, etc...

And like was mentioned before, no contractor will pay for those things based on a year to year contract...

Until anyone knows exactly what is being built, all speculation that "we're getting ripped off" is pure folly...
__________________
Most things I worry about
Never happen anyway...

-Tom Petty

Last edited by JMintzer; 05-27-2024 at 07:09 PM.
  #22  
Old 05-27-2024, 03:23 PM
Stu from NYC Stu from NYC is offline
Sage
Join Date: Feb 2020
Posts: 15,303
Thanks: 1,263
Thanked 16,272 Times in 6,378 Posts
Default

Quote:
Originally Posted by JMintzer View Post
Because it's most likely not "just" a simple storage shed, with a bathroom and HVAC...

They will have to install fuel tanks (which aren't cheap), upgraded electric, water, fire suppression, and all other things needed to help maintain the vehicles.

If they're installing fuel tanks, that a whole other can-o-worms, with special permits, environmental concerns, etc...

And lie was mentioned before, no contractor will pay for those things based on a year to year contract...

Until anyone knows exactly what is being built, all speculation that "we're getting ripped off" is pure folly...
A little folly goes a long way
  #23  
Old 05-27-2024, 06:07 PM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,862
Thanks: 1,013
Thanked 11,056 Times in 4,226 Posts
Default

Quote:
Originally Posted by JMintzer View Post
Until anyone knows exactly what is being built, all speculation that "we're getting ripped off" is pure folly...
__________________
Identifying as Mr. Helpful
  #24  
Old 05-27-2024, 07:52 PM
Normal's Avatar
Normal Normal is offline
Soaring Eagle member
Join Date: Jun 2021
Location: Earth
Posts: 2,483
Thanks: 5,349
Thanked 1,835 Times in 894 Posts
Default Equipment

The equipment alone can’t even be valued at 100,000. 1.7 million is way overboard. What is shown would fit in my 3 car garage for crying out loud.
__________________
Everywhere

“ Hope Smiles from the threshold of the year to come, Whispering 'it will be happier'.”—-Tennyson

Borta bra men hemma bäst
  #25  
Old 05-27-2024, 07:58 PM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,862
Thanks: 1,013
Thanked 11,056 Times in 4,226 Posts
Default

Quote:
Originally Posted by Normal View Post
The equipment alone can’t even be valued at 100,000. 1.7 million is way overboard. What is shown would fit in my 3 car garage for crying out loud.
Stop crying until you understand where they sharpen the blades, where maint is performed, where the office is, where the break room is, where the cleaning pit is, etc., etc., etc.
__________________
Identifying as Mr. Helpful
  #26  
Old 05-27-2024, 08:01 PM
Normal's Avatar
Normal Normal is offline
Soaring Eagle member
Join Date: Jun 2021
Location: Earth
Posts: 2,483
Thanks: 5,349
Thanked 1,835 Times in 894 Posts
Default

Quote:
Originally Posted by dewilson58 View Post
Stop crying until you understand where they sharpen the blades, where maint is performed, where the office is, where the break room is, where the cleaning pit is, etc., etc., etc.
Shouldn’t the contractor take care of his people and equipment? After all, everything has been good for the past 15 years.
__________________
Everywhere

“ Hope Smiles from the threshold of the year to come, Whispering 'it will be happier'.”—-Tennyson

Borta bra men hemma bäst
  #27  
Old 05-28-2024, 06:09 AM
HoosierPa HoosierPa is offline
Veteran member
Join Date: Dec 2015
Location: Village of Cason Hammock
Posts: 618
Thanks: 119
Thanked 252 Times in 130 Posts
Default

I can only assume that everyone posting here who seems so concerned will be attending future CDD meetings to ask questions of your CDD Supervisors.

If not, you are wasting your time posting here.
__________________
Central Illinois, Missouri, Illinois, Southern Ms, Chicago Il, Atlanta Ga, South Florida, Central Indiana, Village of Collier, Village of Marsh Bend, Village of Cason Hammock

  #28  
Old 05-28-2024, 06:15 AM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,862
Thanks: 1,013
Thanked 11,056 Times in 4,226 Posts
Default

Quote:
Originally Posted by Normal View Post
Shouldn’t the contractor take care of his people and equipment? After all, everything has been good for the past 15 years.
"you" pay for it one way or another
__________________
Identifying as Mr. Helpful
  #29  
Old 05-28-2024, 06:16 AM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,862
Thanks: 1,013
Thanked 11,056 Times in 4,226 Posts
Default

Quote:
Originally Posted by HoosierPa View Post
If not, you are wasting your time posting here.
Bingo.
__________________
Identifying as Mr. Helpful
  #30  
Old 05-28-2024, 06:53 AM
jmpalladino's Avatar
jmpalladino jmpalladino is offline
Member
Join Date: Dec 2018
Posts: 84
Thanks: 307
Thanked 54 Times in 28 Posts
Default

Quote:
Originally Posted by village dreamer View Post
sounds like they are going to spend 1.7 mill to build a maintenance shed for the contractors equipment. at mira masa ex golf course. heck, they cant even maintain grass and they need a 1.7 millon shed. take the 1.7 mill and put in on the golf course.
The best part is that the District has already pulled the permit to build with Lady Lake and the ACC has not approved the project. Time to get better oversight of the management of the District. If this was a business the District Manager would be fired as the Board has not approved this action. Time for The District Manager to go......
Closed Thread

Tags
mill, shed, golf, maintenance, millon

Thread Tools

You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 02:26 PM.