Default Morse Bridge to be fixed, but not the bridge?

They are going to spend 1.38 million to fix erosion by the Morse bridge. The PWAC says the bridge is fine and the problem is erosion. "There is no problem with the bridge. There never has been. This is an erosion problem"

I guess that bumpy bridge deck is considered normal and won't be fixed?

Last edited by Bilyclub; 03-26-2021 at 10:23 AM.
  #2  
Old 03-26-2021, 12:36 PM
Vikingjunior Vikingjunior is offline
Senior Member
Join Date: Nov 2017
Posts: 231
Thanks: 59
Thanked 501 Times in 134 Posts
Default

That bridge was a horrible design. The MMP is way to narrow and the sidewalk doesn't extend to the whole bridge. I've seen many a golf cart hit that sidewalk where it begins and almost flip. Very dangerous bridge especially at night if don't realize that the sidewalk begins at the middle of the bridge.
  #3  
Old 03-26-2021, 01:48 PM
blueash's Avatar
blueash blueash is offline
Sage
Join Date: Jan 2008
Posts: 3,392
Thanks: 253
Thanked 3,498 Times in 941 Posts
Default

Quote:
Originally Posted by Bilyclub View Post
They are going to spend 1.38 million to fix erosion by the Morse bridge. The PWAC says the bridge is fine and the problem is erosion. "There is no problem with the bridge. There never has been. This is an erosion problem"

I guess that bumpy bridge deck is considered normal and won't be fixed?
The land upon which the bridge is built is the responsibility of the PWAC because that's they way it was set up. The road is the responsibility of Sumter County not the PWAC. So your They, meaning the PWAC is not the agency to complain about if you are unhappy with the road. Even if the PWAC felt the road needed fixing, it is not within their power to fix it.
  #4  
Old 03-26-2021, 02:58 PM
Marathon Man Marathon Man is offline
Sage
Join Date: Feb 2015
Posts: 2,844
Thanks: 4
Thanked 3,112 Times in 1,114 Posts
Default

Quote:
Originally Posted by Bilyclub View Post
They are going to spend 1.38 million to fix erosion by the Morse bridge. The PWAC says the bridge is fine and the problem is erosion. "There is no problem with the bridge. There never has been. This is an erosion problem"

I guess that bumpy bridge deck is considered normal and won't be fixed?
Always best to become informed before making a complaint.
  #5  
Old 03-26-2021, 03:20 PM
stan the man stan the man is offline
Veteran member
Join Date: May 2016
Posts: 833
Thanks: 1,019
Thanked 269 Times in 136 Posts
Default

Who cares close the bridge..
  #6  
Old 03-26-2021, 03:24 PM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 12,866
Thanks: 1,013
Thanked 11,059 Times in 4,227 Posts
Default

Quote:
Originally Posted by Vikingjunior View Post
That bridge was a horrible design. The MMP is way to narrow and the sidewalk doesn't extend to the whole bridge. I've seen many a golf cart hit that sidewalk where it begins and almost flip. Very dangerous bridge especially at night if don't realize that the sidewalk begins at the middle of the bridge.
Slow Down!!!!
__________________
Identifying as Mr. Helpful
  #7  
Old 03-26-2021, 03:56 PM
Topspinmo's Avatar
Topspinmo Topspinmo is offline
Sage
Join Date: Dec 2012
Location: Somewhere over the rainbow
Posts: 15,294
Thanks: 7,678
Thanked 6,312 Times in 3,266 Posts
Default

Quote:
Originally Posted by blueash View Post
The land upon which the bridge is built is the responsibility of the PWAC because that's they way it was set up. The road is the responsibility of Sumter County not the PWAC. So your They, meaning the PWAC is not the agency to complain about if you are unhappy with the road. Even if the PWAC felt the road needed fixing, it is not within their power to fix it.
That’s good to know that PWAC which paid for by residents. Being its’ the resident land now I can fish from the rip rap.
  #8  
Old 03-26-2021, 04:04 PM
Garywt Garywt is offline
Soaring Eagle member
Join Date: Apr 2016
Posts: 2,013
Thanks: 4
Thanked 2,003 Times in 721 Posts
Default

I find the bridge to be fine as long as you are careful. To widen the path any would eliminate one of the car lanes which will not happen as that will start the traffic complaints again.
  #9  
Old 03-26-2021, 04:42 PM
Laker14 Laker14 is offline
Sage
Join Date: Dec 2008
Posts: 2,612
Thanks: 2
Thanked 2,922 Times in 1,060 Posts
Default

Quote:
Originally Posted by Marathon Man View Post
Always best to become informed before making a complaint.
Bulloney. I don't need no stinkin' facts. (they confuse me)
  #10  
Old 03-26-2021, 05:18 PM
DeanFL's Avatar
DeanFL DeanFL is offline
Platinum member
Join Date: Dec 2012
Posts: 1,817
Thanks: 339
Thanked 2,470 Times in 611 Posts
Default

perhaps the expected upcoming $3 TRILLION Federal "Infrastructure Bill" will cover the Morse Bridge reconstruction. yeah sure.
__________________
I have CDO. It's like OCD but all the letters are in alphabetical order - AS THEY SHOULD BE.
"Yesterday Belongs to History, Tomorrow Belongs to God, Today Belongs to Me"
  #11  
Old 03-26-2021, 08:28 PM
Nucky's Avatar
Nucky Nucky is offline
Sage
Join Date: Apr 2015
Posts: 11,093
Thanks: 4,404
Thanked 3,625 Times in 1,882 Posts
Default

Quote:
Originally Posted by dewilson58 View Post
Slow Down!!!!
Whhaat dooees a yellloww liight meean?

Regards From Jim Ignatowski
  #12  
Old 03-26-2021, 10:53 PM
Bilyclub's Avatar
Bilyclub Bilyclub is offline
Platinum member
Join Date: Aug 2019
Posts: 1,972
Thanks: 578
Thanked 1,368 Times in 646 Posts
Default

Quote:
Originally Posted by Marathon Man View Post
Always best to become informed before making a complaint.
It was more like a curious observation of what seems to be a badly designed and constructed bridge.
  #13  
Old 03-27-2021, 06:10 AM
am.zinger@aol.com am.zinger@aol.com is offline
Member
Join Date: Apr 2020
Posts: 36
Thanks: 23
Thanked 33 Times in 11 Posts
Default

How can the bridge be OK if it's foundation is eroding?
  #14  
Old 03-27-2021, 06:18 AM
Fastskiguy Fastskiguy is offline
Veteran member
Join Date: Sep 2014
Location: Linden
Posts: 587
Thanks: 634
Thanked 286 Times in 180 Posts
Default

Quote:
Originally Posted by dewilson58 View Post
Slow Down!!!!
At the speed limit of 10mph it's not dangerous. It's maniacs going 25mph that make it dangerous.
  #15  
Old 03-27-2021, 06:53 AM
Girlcopper Girlcopper is offline
Gold member
Join Date: May 2017
Posts: 1,177
Thanks: 70
Thanked 1,639 Times in 637 Posts
Default

Quote:
Originally Posted by Fastskiguy View Post
At the speed limit of 10mph it's not dangerous. It's maniacs going 25mph that make it dangerous.
Yep, and the speeding maniacs are always the complainers. Youre in a golf cart! Not a car! You dont owm the road though you think you do. Slow down!!