When You Have No Options--Is This Extortion?
This week we replaced the original carpeting in our LR\DR with a laminate floor. The job got off to a bad start. The installers removed the carpet and padding, and then “discovered” that there were several depressions in the concrete slab. What a surprise! (We understand anecdotally that an imperfect slab is par for The Villages home construction. The installers called the flooring store who then called me back directing me to pay them $300 to fix the floor. They really had me over a barrel. Either live with the house upside down indefinitely or agree to pay. It felt like extortion, and I wonder how frequently this happens. Has anyone else had a similar experience and how you do deal with it?
George |
|
#2
|
||
|
||
Quote:
|
#3
|
||
|
||
Replaced my LR/DR/Den with laminate and for what's it worth, concrete was in good shape. Agree with checking under 1 year warranty for repairs. We had Floormasters and they did a good job. Who is your flooring contractor?
|
#4
|
||
|
||
Floormasters just ripped up 1500 sq feet of flooring in our 14 year old designer. They are used to working in TV. They found the floor uneven and some cracks. There was never any talk of more money. They just sent a larger crew the next day. We are thrilled with the results.
|
#5
|
||
|
||
Quote:
|
#6
|
||
|
||
It should be covered under TV home warranty; even if past the warranty deadline date, this is a latent defect, so should still be covered. If you cannot get the flooring company to revise the charge, if you feel it was too much, then TV should either refund you the full amount or debate with the flooring company the reasonableness of the cost of the repair.
__________________
Freeda Louthan Lexington KY 1951-1972, Louisville KY 1972-2007 The Villages FL since 2007 - Home for good, at last Measure your wealth not by the things that you have, but by the things you have for which you wouldn't take money. The world needs dreamers; the world needs 'do'-ers. But most of all, the world needs dreamers who are do-ers. |
#7
|
||
|
||
I appreciate everyone's input. We will be here 5 years this December and I suspect our original home warranty that may have covered defects in the slab has already expired. In this kind of situation, you have only a few minutes to make a decision before the installers walk off the job. In our case, we also had painters scheduled to come a week later, which added some urgency and the need to get this job finished. Next time, we'll use Floormasters as suggested. I was just curious if this has become standard practice in this area to squeeze money out of people--after the sale.
George |
#8
|
||
|
||
We replaced our new carpet with wood flooring shortly before we moved in and part of the cost included taking care of any problems with the floor so they would have a level surface to work with.
__________________
TV AT LAST,Jonesboro AR, NashvilleTn, Northville MI, Okemos MI, Howell, MI, Berkley MI, Royal Oak, MI Nothing so needs reforming as other peoples habits. "Mark Twain" |
#9
|
||
|
||
We replaced old carpet with wood floors and it too included any leveling that had to be done. Just curious........why have the floors done before painting ??? We had painting done first, didn't matter if some crazy thing happened with the paint. Hope your floors are beautiful and you love them !
|
#10
|
||
|
||
Quote:
|
#11
|
||
|
||
This is an update to my earlier post about my laminate floor install last week. The salesman who sold us the laminate floor came back yesterday afternoon for the balance. He told me instead of complaining to him that I should be writing a letter to the Morses about the poor finish on the slab. He said they should have charged me $500. My response was that if they had actually done the job properly, I would have paid $500 but they put less than an hour into leveling the floor, that areas were still not level, and that they hadn't even earned the $300. I wasn't looking for an argument, or a reduction in the final price. At this point, all I wanted was a simple apology for a job that could have been better. According to the salesman, this crew has done over 1,000 jobs and we're the first to complain. Yeah sure!
George |
#12
|
||
|
||
So what's the name of the company so they can be avoided by others. Curious minds want to know.
pm me if you don't feel comfortable saying who they are on this site. Thanks.......... |
#13
|
||
|
||
Ajack, I was a flooring installer for 24 yrs, mainly commercial over concrete, we installed every type of floor imaginable. e.g. lets say we had to take up the old carpet to put in a vinyl tile floor, once the carpet is removed(it masks any floor indentations) we would find major depressions sometimes that could not be installed over without the customer rejecting the job, so it had to be patched and filled in, somebody has to pay for that work, so the Superintendant of the job would sign job tickets for the work to be billed.
Same thing with your floor, if it was new carpet being installed and it would not be noticeable, but with any type of vinyl or wood, it has to be fixed, the salesman at the time would not be able to determine that with carpet down. No, the flooring company did the right thing, you wouldnt have wanted them to go over a major depression in the floor, they had no idea what was beneath that carpet and arent responsible for a bad slab, whoever poured it is. |
#14
|
||
|
||
The flooring company only did the right thing if the customer was told that the floors in TV often need additional work to level them and here are the extra charges. When you deal with an experienced contractor they know the issues.
That's why you get a flooring contractor and not a few boxes of flooring and some guys off the street. |
#15
|
||
|
||
Correct Snowbird, I know when I was installing I wanted to get the job done as quick as possible and as much professionalism to boot, last thing I wanted to do is get latex patch mix, pour it into a 5 gallon bucket, break out the drill and paddle, mix it up and pour, then .....I have to wait for it to dry before continuing, which could delay the job for a day or so, no installer wants to do that, they want to get it over with.
You should be glad they held up the job, so of these off the street guys will cut corners and go ahead and lay over it no matter what the slab looks like, then it is going to telescope thru and look like hell. |